My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2011-05-09_REVISION - M1980146
DRMS
>
Day Forward
>
Revision
>
Minerals
>
M1980146
>
2011-05-09_REVISION - M1980146
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/24/2016 4:33:24 PM
Creation date
6/29/2011 9:41:13 AM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
M1980146
IBM Index Class Name
REVISION
Doc Date
5/9/2011
Doc Name
Cost summary form
From
DRMS
To
Montoya Pit
Email Name
RCO
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
14
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
PROJECT IDENTIFICATION <br />Date : 09- May -2011 ✓ <br />User: <br />RCO <br />Agency or organization name : DRMS <br />- Demolish and dispose of debris <br />- Reduce highwalls to 3:1 <br />- Rip compaction on pit floor <br />- Replace subsoil and topsoil <br />- Backfill and rough grade <br />- Revegetate disturbed areas <br />-Haul reclamation equipment to and from site <br />P42.4 - 2k .pj -wA-rt mJ <br />- j 12- - t - A-L 9 <br />c)04 a T13-g P' -w I 'A- <br />prlJ D If T s-€" 10' 2N,A:re <br />C D S (4 Q -LA; 9 ED 14+-W„- <br />Thi 9 ES A fi /A-S c24-1.-&-) <br />a V -1 T3- WpeS <br />S.►Fr-■ t- it=N -' ' roJ n Q g S 1) 't=o - it. <br />1190f2.M 1'- 1r%) C1-" 01,J (,-- 111S- <br />* includes inflation factor adjustment of : <br />NA <br />detoxify <br />dozer <br />ripper <br />dozer <br />dozer <br />revege <br />mobilize <br />1 <br />1 <br />1 <br />1 <br />1 <br />1 <br />1 <br />SUBTOTALS: <br />5.00 <br />51.53 <br />50.80 <br />116.53 <br />135.60 <br />35.00 <br />3.00 <br />397.46 <br />TOTAL DIRECT COST * = <br />TASK LIST (DIRECT COSTS) <br />NO. <br />101 <br />102 <br />103 <br />104 <br />105 <br />106 <br />107 <br />INDIRECT COSTS <br />OVERHEAD AND PROFIT - <br />Permit or job action :Amendment 4 - Tasks affecting only BLM land %✓ <br />* contingencies accounted for at task level <br />CIRCES Cost Estimating Software <br />COST SUMMARY FORM <br />Permit or job no. : <br />Abbreviation : <br />Filename : <br />TASK DESCRIPTION <br />Liability insurance : <br />Performance bond : <br />Job superintendent : <br />Profit : <br />* assume net hours = 50% of task hours <br />LEGAL - ENGINEERING - PROJECT MANAGEMENT - <br />Financial warranty processing (legal /related costs) : <br />Engineering work and /or contract/bid preparation : <br />Reclamation management and /or administration : <br />CONTINGENCY - <br />M- 1980 -146 <br />none <br />M146 -000 <br />2.02 <br />1.05 <br />198.73 <br />10.00 <br />500.00 <br />Site :Montoya Pit <br />State :Colorado <br />County :La Plata <br />total $ <br />NA NA <br />5.00 % of cntr. <br />NA* NA <br />RECE W <br />JUN 29 2011 <br />Division of Reclamation, <br />Mining and Safety <br />FORM FLEET TASK <br />USED SIZE HOURS <br />of direct <br />of direct <br />hrs*...$/hr: $52.10 <br />of direct <br />CONTRACT AMOUNT (direct + 0 & P) = <br />NA <br />NA <br />NA <br />total = <br />total = <br />total = <br />total = <br />TOTAL 0 & P = <br />total = <br />total = <br />total = <br />total = <br />TOTAL INDIRECT COST = <br />TOTAL BOND AMOUNT (direct + indirect) = <br />• <br />DIRECT <br />COST <br />$2,107 <br />$13,222 <br />$13,192 <br />$29,901 <br />$34,795 <br />$105,359 <br />$1,131 • <br />$199,707 <br />$199,707 <br />$4,034 <br />$2,097 <br />$10,354 <br />$19,971 <br />$36,456 <br />$236,163 <br />$500 <br />NA <br />$11,808 <br />NA <br />$48,764 <br />$248,471 <br />
The URL can be used to link to this page
Your browser does not support the video tag.