Laserfiche WebLink
Days <br />S <br />M <br />T <br />W <br />T <br />F <br />S <br />Work Shifts <br />D <br />D <br />D <br />D <br />D <br />D <br />- <br />D = Day Shift N = Night Shift <br />• <br />amecil° <br />Earth 8 Environmental <br />VLF EARTHWORKS FIELD MONITORING SUMMARY (WEEKLY REPORT) <br />Project Title: CC &V/ Phase 5 <br />Owner: Cripple Creek & Victor Gold Mining Co. <br />Location: Cripple Creek & Victor Gold Mine <br />Work Element: Phase 5 CQA/ VLF <br />Date: July 3, 2010 <br />Reporting Period: 6/27/10 through 7/3/10 <br />CONSTRUCTION ACTIVITIES and PROGRESS: <br />II) EARTHWORKS <br />A) Topsoil <br />1) Stripping <br />No work performed during the week. <br />f& t ll <br />Project No.: 84201125E0 <br />Contractor: Ames Construction Co., Inc. <br />Shift: Day/Night <br />Ambient Temperature Range (F): Low: 48 ° F to 52 °F ( + / -) High: 75 °F to 82 ° F ( + / -) <br />AMEC CQA: Personnel On -site through the Reporting Period (See Attachment A). <br />AMES: Work activities were not performed Saturday (7/3/2010) in observance of the 4 of July holiday. <br />Low volume solution collection fill placement was only performed during night shift on Tuesday <br />(6/29/2010). <br />B) Subgrade Preparation <br />1) VLF <br />Fine grading, moisture conditioning, and compaction of subgrade was performed prior to soil <br />liner fill (SLF) placement during the week. The areas inspected and approved for placement <br />are shown in Figure 2. <br />C) Slope Contouring <br />1) VLF <br />Slope contouring was performed in the following areas; between stations A36 +00 ( + / -) and <br />A41 +50 ( + / -), approximately 0 to 200 feet left of centerline; between stations C1 +00 ( + / -) and <br />C7 +00 ( + / -), approximately 50 to 100 feet left of centerline; between stations E20 +00 ( + / -) and <br />E22 +50 ( + / -), approximately 150 feet left of centerline to 150 feet right of centerline and <br />between stations H0 +00 ( + / -) and 1110 +00 ( + / -), approximately 0 to 300 feet right of <br />VLF Weekly Report WE 07.03.10.D <br />