Laserfiche WebLink
- Cut Casing at <br />Surface <br />Exposed casing removal <br />- 8 to 14 in. diameter <br />steel pipe (LF) <br />8" <br />NA <br />4.00 <br />LF <br />$8.75 <br />$34.99 <br />- Borehole <br />Marker <br />Borehole <br />location/identification <br />marker (EA, material <br />cost only) <br />NA <br />NA <br />2.00 <br />EA <br />$3.81 <br />$7.62 <br />Bottom Plug - <br />18 "Wells (2) <br />PVC plug - 18 in. <br />diameter borehole <br />18" <br />NA <br />2.00 <br />EA <br />$358.67 <br />$717.34 <br />- Fill Holes with <br />Cement <br />Portland cement grout ( <br />Bag, material cost <br />only...94 lb. bag) <br />18" <br />NA <br />917.00 <br />bag <br />$10.90 <br />$9,995.30 <br />- Cut Casing at <br />Surface <br />Exposed casing removal <br />- 8 to 14 in. diameter <br />steel pipe (LF) <br />18" <br />NA <br />9.00 <br />LF <br />$8.75 <br />$78.72 <br />- Borehole <br />Marker <br />Borehole <br />location/identification <br />marker (EA, material <br />cost only) <br />NA <br />NA <br />2.00 <br />EA <br />$3.81 <br />$7.62 <br />Drill Rig Time - <br />All Wells <br />ATLAS COPCO ROC <br />D7- 11,4.0 in. <br />NA <br />NA <br />248.00 <br />EA <br />$174.62 <br />$43,305.76 <br />Water Truck Time <br />- All Wells <br />Water Tanker, 3,500 Gal. <br />NA <br />NA' <br />248.00 <br />EA <br />$97.54 <br />$24,189.92 <br />Borehole Worksheet Cont'd <br />Task # 002 <br />Job Hours: <br />248:00 <br />Page 2 of 2 <br />Total Cost: $91,577.71 <br />CIRCES Cost Estimating Software <br />