Laserfiche WebLink
Demo Worksheet Cont'd <br />Job Hours: 3,600.00 <br />Task # 001 <br />Subtotal <br />(unadjusted): $872,174.74 <br />Total Cost <br />(adjusted for <br />location): <br />Page 6 of 6 <br />$866,069.52 <br />CIRCES Cost Estimating Software <br />5,000 gal. tank <br />Storage Tank - 4,000 <br />Gallon Diesel <br />4,000 Gallons <br />Comprehensive storage <br />tank removal, non- <br />leaking - 3,000 to <br />5,000 gal tank <br />1.00 <br />EA <br />$3,707.60 <br />$3,707.60 <br />Storage Tank - 500 <br />Gallon Diesel <br />500 Gallons <br />Comprehensive storage <br />tank removal, non- <br />leaking - 3,000 to <br />5,000 gal. tank <br />1.00 <br />EA <br />$3,707.60 <br />$3,707.60 <br />Storage Tanks - <br /><1,000 Gallons <br />12 Total <br />Comprehensive storage <br />tank removal, non- <br />leaking - 3,000 to <br />5,000 gal. tank <br />12.00 <br />EA <br />$3,707.60 <br />$44,491.20 <br />Storage Tanks - 2- <br />4,000 Gallons <br />3 Total <br />Comprehensive storage <br />tank removal, non- <br />leaking - 3,000 to <br />5,000 gal. tank <br />3.00 <br />EA <br />$3,707.60 <br />$11,122.80 <br />Storage Tanks - <br /><8,000 Gallons <br />2 Total <br />Comprehensive storage <br />tank removal, non- <br />leaking - 9,000 to <br />12,000 gal. tank <br />2.00 <br />EA <br />$8,463.20 <br />$16,926.40 <br />Substations - <br />Transformer Removal <br />4 Each <br />Transformer Removal - <br />Non -PCB <br />4.00 <br />EA <br />$1,500.00 <br />$6,000.00 <br />- Pad <br />20'x20'x6" <br />Demo. and on -site <br />disposal in excavated <br />pit, 6 in. thick - Max. <br />200 ft. push <br />400.00 <br />SF <br />$1.61 <br />$644.00 <br />- Fencing <br />750 LF <br />Fencing, chain link, <br />including posts and <br />fabric - 8 ft. to 10 ft. <br />high <br />750.00 <br />LF <br />$2.74 <br />$2,055.00 <br />Miscellaneous <br />Fencing <br />80 LF <br />Fencing, chain link, <br />including posts and <br />fabric - 8 ft. to 10 ft. <br />high <br />80.00 <br />LF <br />$2.74 <br />$219.20 <br />Asbestos Sampling @ <br />4/Building <br />80 Samples <br />Personal PCM <br />sampling and analysis, <br />4 to 8 samples /day - <br />Average <br />80.00 <br />EA <br />$73.38 <br />$5,870.40 <br />Demo Worksheet Cont'd <br />Job Hours: 3,600.00 <br />Task # 001 <br />Subtotal <br />(unadjusted): $872,174.74 <br />Total Cost <br />(adjusted for <br />location): <br />Page 6 of 6 <br />$866,069.52 <br />CIRCES Cost Estimating Software <br />