Laserfiche WebLink
Portal No. 9 Rock <br />Dust Tanks <br />8'D x 20' <br />Bldg. (MN) demo. /on- <br />site disposal in <br />excavated pit - Max. <br />200 ft. push <br />1,005.00 <br />CF <br />$0.20 <br />$198.99 <br />- Footers <br />2'x3'x24 LF <br />Demo. and on -site <br />disposal in excavated <br />pit, 2.0 ft. x 3 ft. - Max. <br />200 ft. push <br />24.00 <br />LF <br />$19.30 <br />$463.20 <br />Brazel -Simms <br />Building <br />60'x40'x15' <br />Bldg. (MN) demo. /on- <br />site disposal in <br />excavated pit - Max. <br />200 ft. push <br />36,000.00 <br />192.00 <br />CF <br />LF <br />$0.20 <br />$6.43 <br />$7,128.00 <br />$1,234.56 <br />- Footers <br />l'x2'x192 LF <br />Demo. and on -site <br />disposal in excavated <br />pit, 1.0 ft. x 2 ft. - Max. <br />200 ft. push <br />- Pad <br />60'x40'x4" <br />Demo. and on -site <br />disposal in excavated <br />pit, 4 in. thick - Max. <br />200 ft. push <br />2,400.00 <br />SF <br />$1.07 <br />$2,568.00 <br />No. 9 Mine <br />Bathhouse/Warehouse <br />24'x50'x12' <br />Bldg. (MN) demo. /on- <br />site disposal in <br />excavated pit - Max. <br />200 ft. push <br />43,200.00 <br />CF <br />$0.20 <br />$8,553.60 <br />- Footers <br />l'x2'x420 LF <br />Demo. and on -site <br />disposal in excavated <br />pit, 1.0 ft. x 2 ft. - Max. <br />200 ft. push <br />420.00 <br />LF <br />$6.43 <br />$2,700.60 <br />Carpenter's Shop <br />50'x20'x10' <br />Bldg. (MN) demo. /on- <br />site disposal in <br />excavated pit - Max. <br />200 ft. push <br />10,000.00 <br />CF <br />$0.20 <br />$1,980.00 <br />- Footers <br />l'x2'x132 LF <br />Demo. and on -site <br />disposal in excavated <br />pit, 1.Oft.x2ft. -Max. <br />200 ft. push <br />132.00 <br />LF <br />$6.43 <br />$848.76 <br />Shop Near SH -P1 <br />60'x50'x15' <br />Bldg. (MN) demo. /on- <br />site disposal in <br />excavated pit - Max. <br />200 ft. push <br />Demo. and on -site <br />disposal in excavated <br />pit, 6 in. thick - Max. <br />200 ft. push <br />45,000.00 <br />3,000.00 <br />CF <br />SF <br />$0.20 <br />$1.61 <br />$8,910.00 <br />$4,830.00 <br />- Pad <br />60'x50'x6" <br />Rock Dust Tank by <br />Okie Plaza <br />8'D x 20' <br />Bldg. (MN) demo. /on- <br />site disposal in <br />excavated pit - Max. <br />200 ft. push <br />1,005.00 <br />CF <br />$0.20 <br />$198.99 <br />- Footers <br />2'x3'x24 LF <br />Demo. and on -site <br />disposal in excavated <br />pit, 2.0 ft. x 3 ft. - Max. <br />200 ft. push <br />24.00 <br />LF <br />$19.30 <br />$463.20 <br />Wash -Down Pad at <br />No. 5 Mine <br />52'x25'x12" <br />Demo. and on -site <br />disposal in excavated <br />pit, 12 in. thick - Max. <br />200 ft. push <br />1,300.00 <br />SF <br />$3.22 <br />$4,186.00 <br />- Footers <br />2'x3'x243 LF <br />Demo. and on -site <br />disposal in excavated <br />pit, 2.O ft. x 3 ft. - Max. <br />243.00 <br />LF <br />$19.30 <br />$4,689.90 <br />Demo Worksheet Cont'd <br />Task # 001 <br />Page 3 of 6 <br />CIRCES Cost Estimating Software <br />