Laserfiche WebLink
1.000 <br />(AVG.) <br />0.830 <br />(1 SHIFT/DAY) <br />1.000 <br />(DOZ -OC) <br />1.000 <br />(CAT HB) <br />1.000 <br />(CAT HB) <br />0.868 <br />(CAT HB) <br />1.000 <br />(PAT) <br />Bulldozer Worksheet Cont'd <br />Visibility: <br />Job efficiency: <br />Spoil pile: <br />Push gradient: <br />Altitude: <br />Material Weight: <br />Blade type: <br />Net correction: 0.4863 <br />Adjusted unit production: 835.90 LCY/hr <br />Adjusted fleet production: 3343.6 LCY /hr <br />JOB TIME AND COST <br />Fleet size: 4 Dozer(s) <br />Unit cost: $0.320 /LCY <br />Total job time: 1.11 Hours <br />Total job cost: $1,185.90 <br />Task # 066 <br />Page 2 of 2 <br />CIRCES Cost Estimating Software <br />