Laserfiche WebLink
Seg # <br />Haul Distance (Ft) <br />Grade <br />Roll. Res <br />Total Res <br />Velocity (fpm) <br />Travel Time <br />(CAT HB) <br />Job Efficiency: <br />( %) <br />( %) <br />( %) <br />(min) <br />1 <br />600.00 <br />-6.00 <br />8.00 <br />2.00 <br />2939 <br />0.47 <br />Seg # <br />Haul Distance (Ft) <br />Grade <br />Roll. Res <br />Total Res <br />Velocity (fpm) <br />Travel Time <br />(CAT HB) <br />Job Efficiency: <br />( %) <br />( %) <br />( %) <br />(min) <br />1 <br />600.00 <br />6.00 <br />8.00 <br />14.00 <br />1073 <br />0.59 <br />Scraper Worksheet Cont'd Task # 056 Page 2 of 2 <br />Cycle Time: <br />Scraper Loading Time: <br />Maneuver and Spread Time: <br />Job Condition Correction: <br />Return Route: <br />Net Correction: <br />0.830 <br />NA <br />1.00 Minutes <br />0.60 Minutes <br />Travel Time: <br />Road Condition: Soft, rutted dirt, no maintenance or water, 4" tire penetration 8.0 <br />Haul Route: <br />Haul Time: <br />Site Altitude: 5400 feet <br />0.47 minutes <br />Unadjusted unit production/hour: 1,308.27 LCY/Hour <br />Optimal Number of Scrapers per push dozer: <br />Return Time: 0.59 minutes <br />Total Scraper team cycle time: 2.66 minutes <br />Adjusted for job conditions: 1,085.86 LCY/Hour <br />Selected Number of Scrapers: 2 Scraper(s) <br />Adjusted single scraper team (unit) hourly production: 1,085.86 LCY/Hour <br />Adjusted multiple scraper team (fleet) hourly production: 1,085.86 LCY/Hour <br />JOB TIME AND COST <br />Fleet size: 1 Team(s) Total job time: 15.88 Hours <br />Unit cost: $0.566 /LCY Total job cost: $9,759.48 <br />CIRCES Cost Estimating Software <br />Scraper <br />Push Dozer <br />Source <br />Altitude Adj: <br />1.000 <br />NA <br />(CAT HB) <br />Job Efficiency: <br />0.830 <br />NA <br />(CAT HB) <br />Scraper Worksheet Cont'd Task # 056 Page 2 of 2 <br />Cycle Time: <br />Scraper Loading Time: <br />Maneuver and Spread Time: <br />Job Condition Correction: <br />Return Route: <br />Net Correction: <br />0.830 <br />NA <br />1.00 Minutes <br />0.60 Minutes <br />Travel Time: <br />Road Condition: Soft, rutted dirt, no maintenance or water, 4" tire penetration 8.0 <br />Haul Route: <br />Haul Time: <br />Site Altitude: 5400 feet <br />0.47 minutes <br />Unadjusted unit production/hour: 1,308.27 LCY/Hour <br />Optimal Number of Scrapers per push dozer: <br />Return Time: 0.59 minutes <br />Total Scraper team cycle time: 2.66 minutes <br />Adjusted for job conditions: 1,085.86 LCY/Hour <br />Selected Number of Scrapers: 2 Scraper(s) <br />Adjusted single scraper team (unit) hourly production: 1,085.86 LCY/Hour <br />Adjusted multiple scraper team (fleet) hourly production: 1,085.86 LCY/Hour <br />JOB TIME AND COST <br />Fleet size: 1 Team(s) Total job time: 15.88 Hours <br />Unit cost: $0.566 /LCY Total job cost: $9,759.48 <br />CIRCES Cost Estimating Software <br />