Laserfiche WebLink
Location <br />This Week <br />(tons) <br />Cumulative <br />(tons) <br />Comments <br />E Cresson Clay Processing <br />5,895 <br />145,378 <br />S Cresson Clay Processing <br />0 <br />201,199 <br />Processing in area complete. <br />Squaw Gulch Processing <br />0 <br />35,816 <br />Processing in area complete. <br />Total <br />5,895 <br />377,782 <br />Location <br />This Week <br />(tons) <br />Cumulative <br />(tons) <br />Comments <br />Dump 4 LVSCF Processing <br />14,616 <br />405,067 <br />• <br />• <br />• <br />ame0 <br />Earth & Environmental <br />J) Material Processing <br />1) East Cresson Clay Borrow Area <br />Processing of SLF material continued this week. A CAT 320 excavator, a CAT 330 excavator, <br />a CAT 950 front -end loader, and tandem -axel haul trucks were used to excavate, haul, and <br />process the material. <br />2) Low Volume Solution Collection Fill Material <br />Processing of Low Volume Solution Collection Fill material continued at the Dump 4 LVSCF <br />Process. A CAT D -10 dozer and a skid steer loader were used to process the material. <br />Processing of LVSCF material is complete. <br />K) Miscellaneous <br />No work was performed during the week. <br />III) Underground Workings <br />A) Drilling /Excavation <br />Confirmatory drilling was finished at Underground Working #3012. A drill pattern was set out by <br />an AMEC field representative. Seven holes were drilled encountering no voids, encapsulating the <br />previously observed working. An approximate total of 350 feet was drilled. The previously <br />observed void was filled with structural fill material from the recent blast in the area. Remediation <br />of UG #3012 is complete. An AMEC representative observed the confirmatory drilling constantly. <br />All known underground workings within the Phase 5 VLF footprint have been remediated in <br />accordance with design drawings and project specifications. <br />B) Mine Shaft /Stope Remediation <br />No work was performed during the week. <br />C) Lateral/Slot Remediation <br />No work was performed during the week. <br />IV) Storm Water Management Structures <br />A) Control Structures <br />No work was performed during the week. <br />VLF Weekly Report WE 06.19.10.D <br />