• <br />ame0 <br />Earth & Environmental <br />B) Best Management Practices <br />Best Management Practices are being observed throughout the Phase 5 VLF Project. Storm water <br />controls were maintained throughout the week. Precipitation was not substantial throughout the <br />week. Storm water controls are being observed in the East Cresson Clay Borrow. <br />V) VLF Geosynthetics <br />Geomembrane installation within the Phase 5 VLF continued throughout the week, performing <br />deployment, seaming, and repair /QC activities. Geomembrane installation was performed between <br />stations B0 +00 ( + / -) and B10+00 ( + / -), approximately 0 to 800 feet right of centerline (see Figure 4). <br />Approximately 165,332 square feet of 100mil LLDPE (single sided textured and smooth) and 49,400 <br />square feet of 80mil LLDPE single sided textured was deployed using a John Deere 200 excavator and <br />a John Deere 544 front -end loader with spreader -bar attachments. Subgrade was inspected and <br />approved by AMEC and Lonestar representatives prior to geomembrane deployment (see Figure 4). <br />Approximately 8,776 linear feet of seam was fusion welded during deployment using two fusion <br />welding machines. Twenty destructive test samples were marked during seaming. Approximately 359 <br />linear feet of seam was extrusion welded using one extrusion welding machine. One destructive test <br />sample was marked during extrusion seaming. All destructive sample test results met project <br />specifications. Non - destructive testing was performed for all fusion welded seams. Repairs were <br />performed using the extrusion welding method for all marked defects. Vacuum testing was performed <br />for all extrusion welded repairs and seams. <br />III Geomembrane acceptance was not performed during the week (see Figure 5). <br />Two loads of 80mil LLDPE single sided textured geomembrane were delivered to site during the week <br />for a total of 22 rolls. All loads were delivered on flat bed trucks in good condition. The rolls were <br />unloaded using a CAT 966 front -end loader with forks attached. The geomembrane was placed on <br />three pieces of 4" HDPE pipe, staked two rolls high. An AMEC field representative was present at all <br />times during unloading of the geomembrane. The AMEC representative also inventoried the <br />geomembrane, as it was unloaded. <br />CQA ACTIVITIES: <br />SUMMARY: <br />The CQA activities performed consisted of observing, documenting and recording the construction <br />activities of the contractor. <br />AMEC observed structural fill placement within the Phase 5 VLF fill area. Ambient temperatures were <br />monitored during fill placement. <br />AMEC observed, performed necessary testing, obtained moisture samples, and assisted in the moisture <br />conditioning of SLF material within the Phase 5 VLF. <br />AMEC inspected and approved subgrade for geomembrane deployment within the Phase 5 VLF. <br />• AMEC observed, logged data, and assisted in the installation of geomembrane within the Phase 5 VLF. <br />VLF Weekly Report WE 05.29.10.D <br />