My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2010-05-29_REVISION - M1980244
DRMS
>
Day Forward
>
Revision
>
Minerals
>
M1980244
>
2010-05-29_REVISION - M1980244
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/24/2016 4:12:32 PM
Creation date
6/28/2011 12:42:28 PM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
M1980244
IBM Index Class Name
REVISION
Doc Date
5/29/2010
Doc Name
VLF Earthworks Field Monitioring and summary weekly report
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
78
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
amec <br />Earth & Environmental <br />C) Slope Contouring <br />1) VLF <br />Slope contouring was performed in the following areas: between stations A8 +00 ( + / -) and <br />A30 +00 ( + / -), approximately 500 feet left of centerline to 15 feet left of centerline; between <br />stations E14 +00 ( + / -) and E18 +00 ( + / -), approximately 0 to 150 feet right of centerline; <br />between stations G29 +00 ( + / -) and G30 +00 ( + / -), approximately 0 to 150 feet left of <br />centerline; between stations H0 +00 ( + / -) and H3 +00 ( + / -), approximately 0 to 100 feet left of <br />centerline; between stations H26 +00 ( + / -) and H33 +00 ( + / -), approximately 0 to 400 feet right <br />of centerline; and between stations J12 +00 ( + / -) and J30 +00 ( + / -), approximately 300 feet left <br />of centerline to 600 feet right of centerline. Slope contouring was performed using various <br />CAT dozers and various CAT excavators. The material generated as the cut progressed was <br />pushed down the slope. <br />D) Overburden to Stockpile <br />1) VLF <br />No work performed during the week. <br />E) Cut to Fill <br />1) VLF <br />Structural fill placement was performed pushing cut material from between stations J12 +00 <br />( + / -) and J15 +00 ( + / -), approximately 0 to 75 feet right of centerline to an adjacent fill between <br />stations J12 +00 ( + / -) and J15 +50 ( + / -), approximately 0 to 75 feet left of centerline. Cut /fill <br />operations were performed using a CAT D -8 dozer. Structural fill was placed in 18" to 24" <br />lifts. Each lift was moisture conditioned using a CAT 773 water truck (when necessary) and <br />compacted using a 10 -ton vibratory smooth drum compactor, passing over the entire fill <br />surface at least 4 times (method compaction technique was applicable). <br />No blast pattern drilling or blasting was performed during the week. <br />F) Soil Liner Fill <br />1) VLF <br />Soil liner fill (SLF) placement continued in the areas shown in Figure 3, hauling from the East <br />Cresson Clay borrow. Subgrade was approved and moisturized prior to placement using a <br />tandem -axel water truck. Placement was performed using two CAT D -6 dozers, and one CAT <br />skid steer loader in a one -foot compacted lift. Moisture conditioning was performed using a <br />tandem -axel water truck and compaction was performed using a 10 -ton vibratory smooth drum <br />compactor. Nuclear density testing, moisture verification, and depth checks were performed in <br />the geomembrane deployment areas throughout the week. All test results were within project <br />specifications and all test locations were surveyed by Ames. <br />SLF material was hauled from the East Cresson Clay borrow area and stockpiled near stations <br />A28 +00 ( + / -), approximately 200 feet left of centerline. Material was hauled using CAT 777 <br />haul trucks loaded by a CAT 385 excavator. <br />VLF Weekly Report WE 06.12.10.D <br />
The URL can be used to link to this page
Your browser does not support the video tag.