Laserfiche WebLink
amec- <br />Earth & Environmental <br />ATTACHMENT A <br />2010 CQA FIELD STAFF SCHEDULE FOR AMEC PERSONNEL <br />PHASE 5 VLF <br />Name <br />Joseph Hickey <br />Steve Rice <br />Mike Glass <br />Alfonso Frias <br />Benjamin Melly <br />*Tyler Wendlandt <br />Brian Nelson <br />John Lupo <br />Derek Wittwer <br />MAR 28 <br />MAR 29 <br />PR <br />LS <br />LG <br />ST <br />GT <br />ST <br />LT <br />MAR 30 <br />PR <br />LS <br />LG <br />ST <br />GT <br />ST <br />LT <br />MAR 31 <br />PR <br />LS <br />LG <br />ST <br />GT <br />ST <br />LT <br />APR 1 <br />PR <br />LS <br />LG <br />ST <br />GT <br />ST <br />LT <br />APR 2 <br />PR <br />LS <br />ST <br />GT <br />ST <br />LT <br />APR 3 <br />ST <br />*Night Shift <br />LEGEND <br />PS = Project Sponsor <br />PCE = Project Certifying Engineer <br />PM = Project Manager <br />PR = Project Resident <br />LS = Lead Soils Engineer <br />LG = Lead Geosynthetics Engineer <br />ST = Soil Technician <br />LT = Laboratory Technician <br />GT = Geosynthetics Technician <br />FLM= Field/ Laboratory Manager <br />VLF Weekly Report WE 04.03.10.D.doc <br />