Laserfiche WebLink
1 <br />. PCE <br />amec! <br />STAFF SCHEDULE FOR AMEC PERSONNEL <br />Earth & Environmental <br />ATTACHMENT A <br />2010 CQA FIELD <br />PHASE 5 VLF <br />Name <br />APR 11 <br />APR 12 <br />APR 13 <br />APR 14 <br />APR 15 <br />APR 16 <br />APR 17 <br />Joseph Hickey <br />- <br />PR <br />- <br />- <br />- <br />- <br />- <br />Steve Rice <br />- <br />LS <br />LS <br />LS <br />LS <br />LS <br />- <br />Mike Glass <br />- <br />LG <br />LG <br />LG <br />LG <br />LG <br />- <br />Alfonso Frias <br />- <br />ST <br />ST <br />ST <br />ST <br />ST <br />ST <br />Tyler Wendlandt* <br />- <br />ST <br />ST <br />ST <br />ST <br />ST <br />Bill Erickson* <br />- <br />ST <br />ST <br />ST <br />ST <br />ST <br />Benjamin Melly <br />- <br />GT <br />GT <br />GT <br />GT <br />GT <br />- <br />Craig Thompson <br />- <br />GT <br />GT <br />GT <br />GT <br />GT <br />GT <br />Madison Crouch <br />- <br />LT <br />LT <br />LT <br />LT <br />LT <br />LT <br />John Lupo <br />- <br />- <br />- <br />- <br />- <br />- <br />- <br />Derek Wittwer <br />- <br />- <br />- <br />- <br />- <br />- <br />- <br />*Night Shift <br />LEGEND <br />VLF Weekly Report WE 04.17.10.D <br />PS = Project Sponsor <br />= Project Certifying Engineer <br />PM = Project Manager <br />PR = Project Resident <br />LS = Lead Soils Engineer <br />LG = Lead Geosynthetics Engineer <br />ST = Soil Technician <br />LT = Laboratory Technician <br />GT = Geosynthetics Technician <br />FLM= Field/ Laboratory Manager <br />