Laserfiche WebLink
ame0 <br />Earth & Environmental <br />centerline. Slope contouring was performed using various CAT dozers and various CAT <br />excavators. Material generated as the cut progressed was pushed down the slope. <br />D) Overburden to Stockpile <br />1) VLF <br />Oversize rock within the Phase 5 VLF fill area was removed from fill areas and hauled to the <br />overburden stockpile area east of the east perimeter road near stations A28 +00 ( + / -) to A36 +00 <br />( +/ -). <br />E) Cut to Fill <br />1) VLF <br />A CAT 385 excavator and a John Deere 850 excavator were used to excavate structural fill <br />material from the following areas: between stations E1 +00 ( + / -) and E3 +00 ( + / -), <br />approximately 0 to 50 feet right of centerline; between stations E8 +00 ( + / -) and E10 +00 ( + / -), <br />approximately 75 to 100 feet left of centerline; between stations E 14 +00 ( + / -) and E 16 +00 <br />( + / -), approximately 100 to 150 feet right of centerline; and between stations H4 +00 ( + / -) and <br />H10 +00 ( + / -), approximately 50 to 100 feet left of centerline. The structural fill material was <br />loaded into CAT 777 haul trucks and hauled to fill areas. <br />Prior to structural fill placement existing fill areas were ripped and frost was allowed to thaw <br />or was removed (when necessary). Existing fill temperature were monitored and found to be <br />above 32 °F before fill placement. An AMEC representative monitored ambient temperatures <br />on an hourly basis during fill placement. Fill placement was not performed during ambient <br />temperatures below 32 °F. <br />Structural fill was placed in the following areas: between stations A54 +00 ( + / -) and A57 +00 <br />( + / -), approximately 0 to 100 feet left of centerline; between stations B10+00 ( + / -) and B14+00 <br />( + / -), approximately 0 to 100 feet left of centerline; between stations C0 +50 ( + / -) and C7 +00 <br />( + / -), approximately 75 feet left of centerline to 75 feet right of centerline; between stations <br />F1 +50 ( + / -) and F2 +75 ( + / -), approximately 0 to 100 feet right of centerline; between stations <br />H30 +00 ( + / -) and H34 +00 ( + / -), approximately 0 to 100 feet left of centerline; and between <br />stations J8 +00 ( + / -) and J12 +00 ( + / -), approximately 0 to 150 feet left of centerline. Structural <br />fill was placed in 18" to 24" lifts using various CAT dozers. Each lift was moisture <br />conditioned using a CAT 773 water truck (when necessary) and compacted using a 10 -ton <br />vibratory smooth drum compactor, passing over the entire fill surface at least 4 times (method <br />compaction technique is applicable). <br />Blast pattern drilling was performed between stations H2 +00 ( + / -) and H7 +50 ( + / -), <br />approximately 100 to175 feet left of centerline. Blasting was performed on Monday <br />(4/12/2010), Tuesday (4/13/2010), and Friday (4/16/2010). No blasting was performed <br />Wednesday (4/14/2010), Thursday (4/15/2010), and Saturday (4/17/2010). <br />F) Material Processing <br />1) East Cresson Clay Borrow Area <br />Processing of Soil Liner Fill material continued this week. A CAT D -8 dozer, a CAT 320 <br />excavator, a CAT 966 front -end loader, and tandem -axel haul trucks were used to excavate, haul, <br />and process the material. <br />VLF Weekly Report WE 04.17.10.D <br />