Laserfiche WebLink
1 <br />1 <br />ame0 <br />STAFF SCHEDULE FOR AMEC PERSONNEL <br />Earth & Environmental <br />ATTACHMENT A <br />2010 CQA FIELD <br />PHASE 5 VLF <br />Name <br />APR 4 <br />APR 5 <br />APR 6 <br />APR 7 <br />APR 8 <br />APR 9 <br />APR 10 <br />Joseph Hickey <br />- <br />PR <br />PR <br />PR <br />PR <br />PR <br />PR <br />Steve Rice <br />- <br />LS <br />LS <br />LS <br />LS <br />LS <br />- <br />Mike Glass <br />- <br />- <br />LG <br />LG <br />LG <br />- <br />- <br />Alfonso Frias <br />- <br />ST <br />ST <br />ST <br />ST <br />ST <br />ST <br />Benjamin Melly <br />- <br />GT <br />GT <br />GT <br />GT <br />GT <br />GT <br />*Tyler Wendlandt <br />- <br />ST <br />ST <br />ST <br />ST <br />ST <br />- <br />Madison Crouch <br />- <br />LT <br />LT <br />LT <br />LT <br />LT <br />LT <br />John Lupo <br />- <br />PCE <br />- <br />- <br />PCE <br />- <br />- <br />Derek Wittwer <br />- <br />- <br />- <br />- <br />PM <br />- <br />- <br />*Night Shift <br />LEGEND <br />VLF Weekly Report WE 04.10.10.D <br />PS = Project Sponsor <br />PCE = Project Certifying Engineer <br />PM = Project Manager <br />PR = Project Resident <br />LS = Lead Soils Engineer <br />LG = Lead Geosynthetics Engineer <br />ST = Soil Technician <br />LT = Laboratory Technician <br />GT = Geosynthetics Technician <br />FLM= Field/ Laboratory Manager <br />