Laserfiche WebLink
Task description: <br />Site: Coal Ridge No. 1 Mine Permit Action: Permit Renewal 06 <br />PROJECT IDENTIFICATION <br />Task #: 006 <br />Date: 19- May -11 <br />User: JRS <br />HOURLY EQUIPMENT COST <br />Basic Machine: <br />Horsepower: <br />Blade Type: <br />Attachment: <br />Shift Basis: <br />Data Source: <br />Cost Breakdown: <br />Agency or organization name' DRMS <br />Ownership Cost/Hour: <br />Operating Cost/Hour: <br />Ripper op. Cost/Hour: <br />Operator Cost/Hour: <br />Cat D9R - 9SU (2005) <br />405 <br />Semi - Universal <br />NA <br />1 per day <br />(CRG) <br />Total unit Cost/Hour: $198.57 <br />Total Fleet Cost/Hour: $198.57 <br />MATERIAL QUANTITIES <br />Initial Volume: <br />Swell factor: <br />Loose volume: <br />HOURLY PRODUCTION <br />Average push distance: <br />Unadjusted hourly production: <br />10,785 <br />1.165 <br />12,565 LCY <br />Source of estimated volume: <br />Source of estimated swell factor: <br />Materials consistency description: <br />Average push gradient: <br />Average site altitude: <br />Backfill Sediment Pond A <br />-10 % <br />5,700 feet <br />$49.19 <br />$110.89 <br />$0.00 <br />$38.49 <br />Material weight: 2,900 lbs /LCY <br />State: Colorado <br />County: Garfield <br />Plate 4 -1 <br />Cat Handbook <br />100 feet <br />1,243.2 LCY/hr <br />BULLDOZER WORK <br />Weight description: Decomposed rock - 50% Rock, 50% Earth <br />Utilization % <br />NA <br />100 <br />0 <br />NA <br />Compacted fill or embankment 0.9 <br />Abbreviation: None <br />Page 1 of 2 <br />Permit/Job #: C 1984065 <br />Filename: C065 -006 <br />CIRCES Cost Estimating Software <br />