Laserfiche WebLink
EMBANKMENT <br />1). Adequacy of the vegetative cover: <br />2) .Erosion forming Gullies: <br />4). Is erosion occurring at the discharge outlet? <br />ANNUAL SEDIMENTATION POND INSPECTION REPORT :. <br />Mine: Southfield <br />NPDES ID No: Pond #5 <br />Inspection Period:_FiFst-Quarter 2011 ,P NO QTK. <br />Inspection Date: May 5, 2011 <br />CDMR Rule 4.05.9(14) and 4.05.9(15) <br />GENERAL DESCRIPTION OR REFERENCE TO SITE PLAN: <br />4). Erosion of the downstream toe of the embankment? <br />5). Is seepage occurring through the dam? <br />Could this seepage cause potential instability? <br />This sediment control pond lies north east of main facilities area. All drainage from the reclaimed mine <br />facilities area is directed to this pond. The facility is inactive. <br />Excellent Moderate Few Poor <br />Extensive Some Few None <br />3). Is wave action causing erosion: <br />On the Upstream embankment? Yes No X <br />At the principal spillway inlet? Yes No X <br />Yes No X <br />Cause of erosion can be attributed to: <br />Yes No X <br />PRINCIPAL SPILLWAY <br />1). Is the principal spillway system in working order? Yes X No <br />2). Is the inlet free of debris and restrictive material? Yes X No <br />3). Is the discharge outlet free of restrictive material? Yes X No <br />Yes No X <br />Evaluate the severity: Extensive Moderate Just starting None <br />