Laserfiche WebLink
Task description: <br />Site: West Tennessee <br />PROJECT IDENTIFICATION <br />Task #: <br />Date: <br />User: <br />Basic Machine: <br />Horsepower: <br />Blade Type: <br />Attachment: <br />Shift Basis: <br />Data Source: <br />Cost Breakdown: <br />02A <br />6/22/2011 <br />DMC <br />Agency or organization name: <br />HOURLY EQUIPMENT COST <br />Ownership Cost/Hour: <br />Operating Cost/Hour: <br />Ripper op. Cost/Hour: <br />Operator Cost/Hour: <br />Average push gradient: <br />Average site altitude: <br />1 per day <br />(CRG) <br />Total unit Cost/Hour: $158.69 <br />Total Fleet Cost/Hour: $158.69 <br />MATERIAL QUANTITIES <br />Initial Volume: 51,042 <br />Swell factor: 1.124 <br />Loose volume: 57,351 LCY <br />Job Condition Correction Factor <br />Operator Skill: <br />Material consistency: <br />Pit highwall reduction <br />-15 % <br />10,300 feet <br />State: <br />County: <br />Permit Action: <br />Cat D8R Series II - 8U (2005) <br />310 <br />Universal <br />NA <br />$39.08 <br />$81.13 <br />$0.00 <br />$38.49 <br />DRMS <br />Source of estimated volume: DRMS estimate based on inspection observations <br />Source of estimated swell factor: Cat Handbook <br />Material weight: 2,400 lbs /LCY <br />Weight description: Sand Dry, loose <br />BULLDOZER WORK <br />Colorado <br />Lake <br />0.750 <br />1.100 <br />June 17, 2011 <br />Inspection <br />HOURLY PRODUCTION <br />Average push distance: 75 feet <br />Unadjusted hourly production: 1,155.6 LCY /hr <br />Materials consistency description: Partly consolidated stockpile 1.1 <br />Utilization % <br />NA <br />100 <br />0 <br />NA <br />Source <br />(AVG.) <br />(CAT HB) <br />Page 1 of 2 <br />Permit/Job #: M1981235 <br />Abbreviation: None <br />Filename: M235 -02a <br />CIRCES Cost Estimating Software <br />