Laserfiche WebLink
Non - Roadable <br />Equipment <br />Roadable <br />Equipment <br />0.29 <br />0.29 <br />0.29 <br />0.29 <br />0.50 <br />NA <br />0.50 <br />NA <br />1.57 <br />0.57 <br />Mobilization Worksheet Cont'd Task # 07A <br />EQUIPMENT HAUL DISTANCE and Time <br />Nearest Major City or Town within project area region: LEADVILLE <br />Total one -way travel distance: 10.00 miles <br />Average Travel Speed: 35.00 mph <br />Total Non - Roadable Mob/Demob Cost * $2,727.01 <br />`* two round trips with haul rig: <br />Total Roadable Mob/Demob Cost ** $11.95 <br />** one round trip, no haul rig: <br />Transportation Cycle Time: <br />Haul Time (Hours): <br />Return Time (Hours): <br />Loading Time (Hours): <br />Unloading Time (Hours): <br />Subtotals: <br />JOB TIME AND COST <br />Total job time: <br />Total job cost: $2,738.96 <br />3.14 Hours <br />Page 2 of 2 <br />CIRCES Cost Estimating Software <br />