Laserfiche WebLink
COST SUMMARY WORK <br />Task description: Reclamation Cost Summary <br />Permit Action: June 9, 2011 <br />Inspection <br />Site: Sievers Pit <br />PROJECT IDENTIFICATION <br />Task #: <br />Date: <br />User: <br />000 State: Colorado <br />6/14/2011 County: Garfield <br />DMC <br />Agency or organization name' DRMS <br />TASK LIST (DIRECT COSTS) <br />Task <br />001 <br />002 <br />003 <br />004 <br />005 <br />006 <br />06a <br />007 <br />008 <br />009 <br />Description <br />Form <br />Used <br />Demo onsite structures <br />Rip asphalt road and parking areas <br />Removal/haulage of asphalt to excavated pit <br />Highwall reduction <br />Rip pit floor <br />Distribute topsoil/finish grading <br />Transport topsoil from stockpiles <br />Reveg. slopes <br />Reveg. pit floor <br />Mobilize reclamation crew /equipment <br />DEMOLISH <br />RIPPER <br />LOADER <br />DOZER <br />RIPPER <br />DOZER <br />SCRAPER1 <br />REVEGE <br />REVEGE <br />MOBILIZE <br />Fleet <br />Size <br />1 <br />1 <br />2 <br />1 <br />2 <br />1 <br />1 <br />1 <br />1 <br />1 <br />SUBTOTALS: <br />Task <br />Hours <br />40.00 <br />3.55 <br />6.32 <br />12.18 <br />56.37 <br />69.57 <br />185.89 <br />20.00 <br />40.00 <br />2.68 <br />436.56 <br />Cost <br />$63,842.30 <br />$612.00 <br />$1,480.00 <br />$1,933.17 <br />$19,386.00 <br />$11,040.85 <br />$52,754.83 <br />$8,999.30 <br />$65,875.58 <br />$5,132.83 <br />$231,056.86 <br />INDIRECT COSTS <br />OVERHEAD AND PROFIT: <br />Liability insurance: <br />Performance bond: <br />Job superintendent: <br />Profit: <br />2.02 <br />1.05 <br />218.28 <br />10.00 <br />LEGAL - ENGINEERING - PROJECT MANAGEMENT: <br />Financial warranty processing (legal/related costs): 500.00 <br />Engineering work and /or contract/bid preparation: 0.00 <br />Reclamation management and /or administration: 5.00 <br />CONTINGENCY: 3.00 <br />Total = <br />Total = <br />Total = <br />Total = <br />TOTAL 0 & P = <br />CONTRACT AMOUNT (direct + O & P) = <br />Total = <br />TOTAL INDIRECT COST = <br />TOTAL BOND AMOUNT (direct + indirect) = <br />Permit/Job #: M1977098 <br />Abbreviation: None <br />Filename: M098 -000 <br />Total = <br />Total = <br />$4,667.35 <br />$2,426.10 <br />$12,782.48 <br />$23,105.69 <br />$42,981.62 <br />$274,038.48 <br />500.00 <br />$0.00 <br />$13,701.92 <br />$6,931.71 <br />$64,115.25 <br />$295,172 <br />