Laserfiche WebLink
Non - Roadable <br />Equipment <br />Roadable <br />Equi , ment <br />0.17 <br />0.17 <br />0.17. <br />• <br />0.17 <br />0.50 <br />NA <br />0.50 <br />NA <br />1.34 <br />0.34 <br />Mobilization Worksheet Cont'd Task # 009 Page 2 of 2 <br />EQUIPMENT HAUL DISTANCE and Time <br />Nearest Major City or Town within project area region: GLENWOOD SPRINGS <br />Total one -way travel distance: 6.00 miles <br />Average Travel Speed: 35.00 mph <br />Transportation Cycle Time: <br />Haul Time (Hours): <br />Return Time (Hours): <br />Loading Time (Hours): <br />Unloading Time (Hours): <br />Subtotals: <br />JOB TIME AND COST <br />Total Non - Roadable Mob/Demob Cost * $5,125.66 <br />`* two round trips with haul rig: <br />Total Roadable Mob /Demob Cost ** <br />$7.17 <br />** one round trip, no haul rig: <br />Total job time: <br />Total job cost: $5,132.83 <br />2.69 Hours <br />CIRCES Cost Estimating Software <br />