My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2011-06-14_REVISION - M1977098
DRMS
>
Day Forward
>
Revision
>
Minerals
>
M1977098
>
2011-06-14_REVISION - M1977098
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
6/15/2021 11:46:01 AM
Creation date
6/27/2011 8:15:22 AM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
M1977098
IBM Index Class Name
Revision
Doc Date
6/14/2011
Doc Name
Notice of surety increase SI-04
From
DRMS
To
Lafarge West, Inc.
Type & Sequence
SI4
Email Name
DMC
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
21
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Cost Breakdown: Scraper Work <br />Team <br />Dozer <br />support r., q u n <br />Load Area <br />mein <br />Dump Area <br />iVlailllG.iiaiivli <br />Motor Grader <br />..,K..r =... <br />Water Truck <br />Scraper <br />%Utilization- machine: <br />100 <br />NA <br />NA <br />NA <br />NA <br />NA <br />Ownership cost/hour: <br />$80.72 <br />NA <br />NA <br />NA <br />NA <br />NA <br />Operating cost/hour: <br />1 <br />$178.12 <br />NA <br />NA <br />NA <br />NA <br />NA <br />Ripper op. cost/hour: <br />NA <br />NA <br />NA <br />NA <br />NA <br />NA <br />Operator cost/hour: <br />$24.95 <br />NA <br />NA <br />NA <br />NA <br />NA <br />Unit Subtotals: <br />$283.79 <br />NA <br />NA <br />NA <br />NA <br />NA <br />Number of Units: <br />1 <br />0 <br />0 <br />0 <br />0 <br />0 <br />Group Subtotals: <br />Work: <br />$283.79 <br />Support: <br />$0.00 <br />Maint: <br />$0.00 <br />Task description: Transport topsoil from stockpiles <br />Site: Sievers Pit <br />PROJECT IDENTIFICATION <br />Task #: <br />Date: <br />User: <br />06A <br />6/14/2011 <br />DMC <br />Permit Action: <br />State: Colorado <br />County: Garfield <br />Agency or organization name: DRMS <br />HOURLY EQUIPMENT <br />Total work team cost/hour: $283.79 <br />MATERIAL QUANTITIES <br />Initial volume: <br />Loose volume: <br />97,271 <br />97,271 <br />HOURLY PRODUCTION <br />Material weight: <br />Material description: <br />Rated Payload: <br />Payload Capacity: <br />1,600 lbs /LCY <br />Top Soil <br />75,000 pounds <br />46.88 LCY <br />SCRAPER TEAM WORK <br />- Scraper: <br />- Dozer: <br />Support Equipment -Load Area: <br />-Dump Area: <br />Road Maintenance —Motor Grader: <br />-Water Truck: <br />Equipment Description <br />Cat 637G <br />NA <br />NA <br />NA <br />NA <br />NA <br />CCY <br />LCY <br />Source of estimated volume: <br />Source of estimated swell factor: Cat Handbook <br />June 9, 2011 <br />Inspection <br />72.35 ac. at 10" depth <br />COSTShift basis: 1 per day <br />Swell factor: 1.000 <br />Page 1 of 2 <br />Permit/Job #: M1977098 <br />Abbreviation: None <br />Filename M098 -06a <br />Scraper Bowl (volume) Basis: <br />Struck Volume: 24.00 LCY <br />Heaped Volume: 34.00 LCY <br />Average Volume: 29.00 LCY <br />Adjusted Capacity: 29.00 LCY <br />CIRCES Cost Estimating Software <br />
The URL can be used to link to this page
Your browser does not support the video tag.