My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2011-06-21_REVISION - M2006032
DRMS
>
Day Forward
>
Revision
>
Minerals
>
M2006032
>
2011-06-21_REVISION - M2006032
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
6/15/2021 2:24:17 PM
Creation date
6/27/2011 8:15:20 AM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
M2006032
IBM Index Class Name
Revision
Doc Date
6/21/2011
Doc Name
Receipt of Amendment application package AM-01
From
DRMS
To
Western Gravel, Inc.
Type & Sequence
AM1
Email Name
GRM
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
7
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
(f) <br />in conjunction with Exhibit G - Water Information, Subsection 6.4.7, if required by the Office, further <br />water resources information will be presented on a map in this section. <br />Show the owner's name, type of structures, and location of all permanent or man -made structures <br />contained on the area of affected land and within two hundred (200) feet of the affected land. <br />(h) In conjunction with Exhibit I - Soils Information, Subsection 6.4.9, soils information may be presented <br />on a map in this section; <br />(g) <br />(i) <br />(f) <br />Aerial photos, if available, may be included in this section. <br />EXHIBIT D - Mining Plan (Rule 6.4.4): The mining plan shall supply the following information, correlated with <br />the affected lands, map(s) and timetables: <br />(a) description of the method(s) of mining to be employed in each stage of the operation as related to any <br />surface disturbance on affected lands; <br />(b) earthmoving; <br />(c) all water diversions and impoundments; and <br />(d) the size of area(s) to be worked at any one time. <br />(e) An approximate timetable to describe the mining operation. The timetable is for the purpose of <br />establishing the relationship between mining and reclamation during the different phases of a mining <br />operation. You will not be required to meet specific dates for initiation, or completion of mining in a <br />phase as may be identified in the timetable. This does not exempt you from complying with the <br />performance standards of Section 3.1. Such timetable should include: <br />(1) an estimate of the periods of time which will be required for the various stages or phases of <br />the operation; <br />(ii) a description of the size and location of each area to be worked during each phase; and <br />(iii) outlining the sequence in which each stage or phase of the operation will be carried out. <br />(Timetables need not be separate and distinct from the mining plan, but may be incorporated therein.) <br />A map (in Exhibit C - Pre- Mining and Mining Plan Maps(s) of Affected Lands, Subsection 6.4.3) may be <br />used along with a narrative to present the following information: <br />(1) nature, depth and thickness of the ore body or deposit to be mined and the thickness <br />and type of overburden to be removed (may be marked "CONFIDENTIAL," as per Paragraph <br />1.3(3)); and <br />(ii) nature of the stratum immediately beneath the material to be mined in sedimentary <br />deposits. <br />(g) Identify the primary and secondary commodities to be mined /extracted and describe the intended use; <br />and; <br />
The URL can be used to link to this page
Your browser does not support the video tag.