Laserfiche WebLink
Figure C -1: Building Permit <br />LAKE COUNTY, <br />COLORADO <br />White copy -Building Inspector <br />Yellow copy - Permittee <br />Pink copy - Lake County Assessor <br />BUILDING PERMIT <br />ESTIMATED COST FEE DATE ZONING DISTRICT <br />IS. O. <br />$78,948.00 I $370.00 I December 23, 1987 I IM <br />` ONTRACTOR OR OWNER I ADDRESS OF JOB <br />Leadville Mining & Milling Corp. <br />LEGAL DESCRIPTION <br />Sec. 28, TS.9S., R.80W. <br />No. 00936 <br />SQUARE FEET <br />36001 <br />PERMISSION IS HEREBY GRANTED TO construct A one STORY flotation & gravity <br />CONDITIONS: <br />(I) THIS PERMIT WAS ISSUED IN ACCORDANCE WITH THE PI(OVISIONS SET FORTH IN YOUR APPLICATION AND IS SUBJECT TO THE LA <br />OF THE STATE OF COLORADO AND TO THE ZONING REGULATIONS AND BUILDING CODE OF LAKE COUNTY. <br />(2) THIS PERMIT SHALL EXPIRE IF (A) THE WORK AUTHORIZED IS NOT COMMENCED WITHIN SIXTY (e6) DAYS FROM ISSUE DATE <br />IS) THE BUILDING AUTHORIZED IS SUSPENDED OR ABANDONED FOR A PERIOD OF SIXTY (001 DAYS. <br />(2) IF THIS PERMIT EXPIREB._A NEW_PERMIT_MAY BE ACQUIRED FOR A FEE OF ONE -HALF THE AMOUNT NORMALLY. REQUIRED: PI <br />VIDEO NO CHANGES HAVE BEEN OR WILL. BE MADE IN THE ORIGINAL PLANS AND SPECIFICATIONS AND ANY SUSPENSION <br />ABANDONMENT HAS NOT EXCEEDED ONE (I) YEAR. IF CHANGES ARE MADE OR IF SUSPENSION OR ABANDONMENT EXCEEDSONE <br />YEAR. FULL FEES SHALL BE PAID FOR A NEW PERMIT. <br />(4) NO WORK OF ANY MANNER SHALL BE DONE THAT WILL OBSTRUCT THE NATURAL FLOW OF WATER CAUSING A DRAINAGE PROBLI <br />IS) CONTRACTOR SHALL NOTIFY THE BUILDING INSPECTOR TWENTY -FOUR (24) HOURS IN ADVANCE FOR ALL INSPECTIONS AND BHA <br />RECEIVE WRITTEN APPROVAL ON INSPECTION CARO BEFORE PROCEEDING WITH SUCCESSIVE PHASES OF THE JOB. <br />CHIEF BUILDING/ SPECTOR <br />THIS PERMIT IS NOT TRANSFERABLE <br />CERTIFI Or OC CUPANCY <br />M1990 -057 June 6, 2011 <br />