Laserfiche WebLink
Tailing Storage Volume <br />Phase 1 <br />Phase 2 <br />Phase 3 <br />Total <br />Total volume (yd <br />43,000 <br />29,010 <br />72,010 <br />144,020 <br />Freeboard volume (yd <br />6,790 <br />4,110 <br />4,110 <br />4,110 <br />Net volume (yd <br />36,210 <br />24,900 <br />67,900 <br />139,910 <br />Net volume (ft <br />977,670 <br />672,300 <br />1,833,300 <br />3,777,570 <br />Net weight (st) <br />54,315 <br />37,350 <br />101,850 <br />209,865 <br />Production rate (st/y) <br />56,000 <br />56,000 <br />56,000 <br />56,000 <br />Cons (11% MP st) <br />6,160 <br />6,160 <br />6,160 <br />6,160 <br />Cons shipped (wet st) <br />6,844 <br />6,844 <br />6,844 <br />6,844 <br />Tails (89% MP st) <br />49,840 <br />49,840 <br />49,840 <br />49,840 <br />Solids ( %) <br />65% <br />65% <br />65% <br />65% <br />Water ( %) <br />35% <br />35% <br />35% <br />35% <br />Water reclaim ( %) <br />90% <br />90% <br />90% <br />90% <br />Net Tails slurry (st) <br />52,524 <br />52,524 <br />52,524 <br />52,524 <br />Capacity (yr) <br />1.03 <br />0.71 <br />1.94 <br />4.00 <br />• A 6 -8 inch clay under liner from available onsite selective impermeable soils borrowed <br />from the tailings disposal area, placed and compacted as one lift with a sheepsfoot roller. <br />• A seepage /leak detection system between the clay layer and the synthetic liner with the <br />collection system located in the northwest corner of the impoundment, and the pond <br />impoundment sloping at 0.5% slope to the northwest. <br />• A synthetic pond liner of 45 -mil Polypropylene Geomembrane or equivalent. <br />• Compaction testing during construction. <br />The TSF facility, as a 110(2) permit, is scheduled for 2 phases of development within the <br />existing 4.6 acre TSF area. The TSF 4.6 acre area is shown on Exhibit TSF -01 and the TSF is <br />located within the black line polygon area south of the mill. The Phase 1 TSF is shown on <br />Exhibit TSF -02 and the Phase 1 facility cross - section is shown on Exhibit TSF -04. The Phase 2 <br />TSF is shown on Exhibit TSF -03 and the Phase 2 facility cross - sections are shown on Exhibit <br />TSF -04. <br />The facility is a cut and fill structure, with Phase 1 requiring about 4,500 yd of fill from the <br />existing TSF OB stockpile east of the existing pond. Table C -13 presents the cut and fill balance <br />for the Phase 1 and Phase 2 structures. The networking capacity of Phase 1 is 54,000 st and <br />Phase 2 is 37,000 st. The total pond capacity of Phase 1 is 22.4 ac -ft and Phase 2 is 15.4 ac -ft. <br />Phase 3 is 4 each 5 ft lifts on the combined Phase 1 & 2 ponds, merging the ponds into one pond. <br />Final total net working TSF capacity within the 4.6 acres is estimated at 210,000 st tails at 90% <br />solids. Additional expansion requires increasing the disturbance area beyond the 10 acre 110 <br />permit maximum disturbance and the conversion from a 110(2) permit to a 112 permit. <br />Table C -13: TSF Impoundment Volumes <br />Table C- 14:TSF Capacities <br />M1990 -057 June 6, 2011 <br />Stage 1 <br />Stage 2 <br />Cut (yd <br />18,000 <br />14,000 <br />Fill (yd <br />23,000 <br />4,000 <br />Net Excess (yd <br />-5,000 <br />10,000 <br />• A 6 -8 inch clay under liner from available onsite selective impermeable soils borrowed <br />from the tailings disposal area, placed and compacted as one lift with a sheepsfoot roller. <br />• A seepage /leak detection system between the clay layer and the synthetic liner with the <br />collection system located in the northwest corner of the impoundment, and the pond <br />impoundment sloping at 0.5% slope to the northwest. <br />• A synthetic pond liner of 45 -mil Polypropylene Geomembrane or equivalent. <br />• Compaction testing during construction. <br />The TSF facility, as a 110(2) permit, is scheduled for 2 phases of development within the <br />existing 4.6 acre TSF area. The TSF 4.6 acre area is shown on Exhibit TSF -01 and the TSF is <br />located within the black line polygon area south of the mill. The Phase 1 TSF is shown on <br />Exhibit TSF -02 and the Phase 1 facility cross - section is shown on Exhibit TSF -04. The Phase 2 <br />TSF is shown on Exhibit TSF -03 and the Phase 2 facility cross - sections are shown on Exhibit <br />TSF -04. <br />The facility is a cut and fill structure, with Phase 1 requiring about 4,500 yd of fill from the <br />existing TSF OB stockpile east of the existing pond. Table C -13 presents the cut and fill balance <br />for the Phase 1 and Phase 2 structures. The networking capacity of Phase 1 is 54,000 st and <br />Phase 2 is 37,000 st. The total pond capacity of Phase 1 is 22.4 ac -ft and Phase 2 is 15.4 ac -ft. <br />Phase 3 is 4 each 5 ft lifts on the combined Phase 1 & 2 ponds, merging the ponds into one pond. <br />Final total net working TSF capacity within the 4.6 acres is estimated at 210,000 st tails at 90% <br />solids. Additional expansion requires increasing the disturbance area beyond the 10 acre 110 <br />permit maximum disturbance and the conversion from a 110(2) permit to a 112 permit. <br />Table C -13: TSF Impoundment Volumes <br />Table C- 14:TSF Capacities <br />M1990 -057 June 6, 2011 <br />