Laserfiche WebLink
The Division of Reclamation, Mining and Safety has proposed the decision stated below. Provided there <br />are no objections, the decision will become effective upon the termination of the ten (10) day public <br />comment period, in accordance with Rule 2.08.4(6)(b)(iii). <br />Technical Revision No. 68 <br />Submittal Date: February 16, 2011 <br />Description of Revision: B Seam Dewatering System <br />REVISED INFORMATION <br />APPLICATION PAGES <br />See Attached List <br />CHANGE IN <br />ACREAGE <br />Disturbed: <br />Affected: <br />Permit: <br />State: <br />Federal: <br />Private: <br />3.47 <br />0.00 <br />0.00 <br />0.00 <br />0.00 <br />0.00 <br />DIVISION OF RECLAMATION, MINING AND SAFETY <br />Authorized Representative <br />Date: '717/! <br />COLORADO DIVISION OF RECLAMATION, MINING AND SAFETY <br />1313 Sherman Street, Room 215, Denver, Colorado 80203, (303) 866 -3567 <br />REVISED <br />TOTAL ACREAGE <br />Disturbed: <br />Affected: <br />Permit: <br />State: <br />Federal: <br />Private: <br />454.75 <br />6,083.46 <br />11,788.71 <br />0.00 <br />11,468.71 <br />320.00 <br />COAL MINING PERMIT - TECHNICAL REVISION DECISION <br />Deserado Mine, Blue Mountain Energy, Inc <br />Permit No. C- 1981 -018 <br />Decision: Approve <br />Decision Date: June 17, 2011 <br />MAPS/EXHIBITS <br />See Attached List <br />PERFORMANCE BOND <br />Prior Liability: <br />Change in Liability: <br />Revised Liability <br />Bond Held <br />$5,686,294.00 <br />$8,488.00 <br />$5,694,782.00 <br />$5,686,294.00 <br />GTR- 09_C1981018 3RS_06172011105159.doc <br />