My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2011-06-15_REVISION - P2010015
DRMS
>
Day Forward
>
Revision
>
Prospect
>
P2010015
>
2011-06-15_REVISION - P2010015
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
6/15/2021 11:37:38 AM
Creation date
6/24/2011 12:52:26 PM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
P2010015
IBM Index Class Name
REVISION
Doc Date
6/15/2011
Doc Name
Approval letter for MD-01
From
DRMS
To
Rio Grande Silver, Inc.
Type & Sequence
MD1
Email Name
RCO
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
39
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
PROJECT IDENTIFICATION <br />Task #: <br />Date : <br />User : <br />002 State : Colorado <br />06/03/2011 County :Mineral <br />RCO Site : West Equity Project <br />Agency or organization name :DRMS <br />Permit or other job action :Modification MD-1 <br />Task description :Backfill pad sumps (3 per pad, on 2 pads) <br />HOURLY EQUIPMENT COST <br />Cost Breakdown : <br />MATERIAL QUANTITIES <br />Initial <br />volume : 133 CCY <br />Source of estimated volume :10x10x6 ft sump x 6 sumps total <br />Source of estimated swell factor :na <br />HOURLY PRODUCTION <br />Material consistency description : <br />Consolidated stockpile <br />Basic machine : Cat D5G LGP - 5P <br />Blade type :Power Angle Tilt <br />Attachment no. 1 :ROPS Cab <br />Attachment no. 2 : 3-shank ripper <br />Ownership cost/hour: $17.95 <br />Operating cost/hour: $24.13 <br />Ripper op. cost/hour: $0.00 <br />Operator cost/hour: $38.54 <br />Total unit cost/hour : $80.62 <br />Average push distance : 50 feet <br />Unadjusted hourly production : 464.3 LCY/hr <br />Average push gradient : 0.00 % (pos) <br />Average site altitude : 11,600 feet <br />T- <br />Utilization % <br />NA <br />100 <br />0 <br />NA <br />Permit/job# : P-2010-015 <br />Abbreviation :none <br />Filename :P015-002 <br />Job Condition Correction Factors <br />Operator skill : <br />Material consistency : <br />Dozing method : <br />Visibility : <br />Job efficiency : <br />Spoil pile : <br />Push gradient : <br />Altitude : <br />Material weight : <br />Blade type : <br />Net correction : <br />0.75 <br />1.00 <br />1.00 <br />1.00 <br />0.83 <br />0.80 <br />1.00 <br />0.96 <br />0.79 <br />1.00 <br />0.38 <br />Horsepower : 90 <br />Shift basis : 1 per day <br />Data source : (CRG) <br />Total fleet cost/hour: $80.62 <br />, IpmatiawsmmmEEIROMM <br />Swell Loose <br />factor : 1.165 volume : 155 LCY <br />Source <br />(avg.) <br />(Cat HB) <br />(gen.) <br />(avg.) <br />(1shift/day) <br />(fnd-rt) <br />(Cat HB) <br />(Cat HB) <br />(Cat HB) <br />(PAT) <br />Material weight : 2,900 Ibs/LCY <br />Weight description : <br />Decomposed rock - 50% Rock, 50% Earth Adjusted unit production : 175.98 LCY/hr <br />Adjusted fleet production : 175.98 LCY/hr <br />"Pe , 4 <br />JOB TIME AND COST <br />Fleet size : 1 Dozer(s) Total job time : 0.88 Hours <br />Unit cost : $0.458 /LCY Total job cost : $71 <br />
The URL can be used to link to this page
Your browser does not support the video tag.