Laserfiche WebLink
PROJECT IDENTIFICATION <br />Task # : 007 <br />Date : <br />User: <br />06/03/2011 <br />RCO <br />Agency or organization name :DRMS <br />HOURLY EQUIPMENT COST <br />MATERIAL QUANTITIES <br />Alternate methods - <br />Seismic : <br />Area : <br />NA <br />HOURLY PRODUCTION <br />JOB TIME AND COST <br />Source of estimated quantity :NO/ <br />Source of estimated load factor :NA <br />Alternate methods - <br />Seismic : Seismic velocity : <br />Unadjusted production : <br />Area : Avg. ripping depth : <br />Average ripping width : <br />Average ripping length : <br />Average dozer speed : <br />Average maneuver time : <br />Production per unit area : <br />Unadjusted production : <br />Fleet size : <br />Unit cost : <br />CIRCES Cost Estimating Software <br />BULLDOZER RIPPING WORK <br />State : Colorado <br />County :Mineral <br />Site : West Equity Project <br />Permit or other job action :Modification MD -1 <br />Task description :Rip compaction on roads and pads <br />Cost Breakdown : Ownership cost/hour : <br />Dozer operating cost/hour : <br />Ripper operating cost/hour : <br />Operator cost/hour : <br />Total unit cost/hour : <br />NA Load factor : <br />1.84 acres Rip depth (ft) : <br />NA feet/second <br />NA cu. yds. /hour <br />1.00 <br />5.08 <br />200.00 <br />88.00 <br />0.25 <br />0.555 <br />894.97 <br />Basic machine <br />Blade type <br />Attachment no. 1 <br />Attachment no. 2 <br />feet/pass <br />feet/pass <br />feet/pass <br />feet/minute <br />minutes /pass <br />acres /hour <br />cu. yds. /hour <br />1 dozer(s) <br />$0.116 per cu. yd. <br />:Cat D5G LGP - 5P <br />:Power Angle Tilt <br />:ROPS Cab <br />:3-shank ripper <br />Permit/job # :P- 2010 -015 <br />Abbreviation : none <br />Filename :P015 -007 <br />Utilization % <br />$17.85 NA <br />$24.13 100 <br />$1.93 100 <br />$38.54 NA <br />$82.45 <br />Selected estimating method : Area <br />NA Bank volume : <br />1.00 Volume : <br />Job Condition Correction Factors - <br />Unadjusted production <br />per selected method : 894.97 cu. yds. /hour <br />Site altitude : <br />Altitude adjustment : <br />Job efficiency factor : <br />Net job correction : <br />Total job time : <br />Total job cost : <br />Horsepower: 90 <br />Shift basis : 1 per day <br />Data source : (CRG) <br />Total fleet cost/hour : <br />$82.45 <br />NA BCY <br />2,969 BCY or CCY <br />11,600 feet <br />0.96 (Cat HB) <br />0.83 (1 shift/day) <br />0.80 multiplier <br />Adjusted unit production : 713.12 cu. yds. /hour <br />Adjusted fleet production : <br />713.12 cu. yds. /hour <br />4.16 hours <br />$343 <br />