My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2011-06-15_REVISION - P2010007
DRMS
>
Day Forward
>
Revision
>
Prospect
>
P2010007
>
2011-06-15_REVISION - P2010007
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
6/15/2021 11:33:59 AM
Creation date
6/24/2011 12:52:25 PM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
P2010007
IBM Index Class Name
REVISION
Doc Date
6/15/2011
Doc Name
Approval letter for MD-03
From
DRMS
To
Rio Grande Silver, Inc.
Type & Sequence
MD3
Email Name
RCO
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
5
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
PROJECT IDENTIFICATION <br />Task # : <br />Date : <br />User: <br />002 <br />06/03/2011 <br />RCO <br />Agency or organization name :DRMS <br />Permit or other job action :Modification MD -3 <br />HOURLY EQUIPMENT COST <br />Cost Breakdown : <br />MATERIAL QUANTITIES <br />Initial <br />volume : <br />267 <br />HOURLY PRODUCTION <br />Material consistency description : <br />Consolidated stockpile <br />CCY <br />Average push distance : 50 feet <br />Unadjusted hourly production : 464.3 LCY /hr <br />Average push gradient : 0.00 % (pos) <br />Average site altitude : 11,600 feet <br />Material weight : 2,900 Ibs /LCY <br />Weight description : <br />Decomposed rock - 50% Rock, 50% Earth <br />JOB TIME AND COST <br />Fleet size : <br />Unit cost : <br />CIRCES Cost Estimating Software <br />BULLDOZER WORK <br />State : Colorado <br />County :Mineral <br />Site :North Amethyst Project <br />Task description :Backfill pad sumps (3 per pad, on 4 pads) <br />Basic machine : Cat D5G LGP - 5P <br />Blade type :Power Angle Tilt <br />Attachment no. 1 :ROPS Cab <br />Attachment no. 2 :3-shank ripper <br />Ownership cost/hour : <br />Operating cost/hour : <br />Ripper op. cost/hour : <br />Operator cost/hour : <br />Total unit cost/hour : <br />1 Dozer(s) <br />$0.458 /LCY <br />Swell <br />factor: <br />1.165 <br />Source of estimated volume :10x10x6 ft sump x 12 sumps total <br />Source of estimated swell factor :na <br />Permit/job# : P -2010 -007 <br />Abbreviation :none <br />Filename : P007 -002 <br />Utilization % <br />$17.95 NA <br />$24.13 100 <br />$0.00 0 <br />$38.54 NA <br />$80.62 <br />Loose <br />volume : 311 <br />Job Condition Correction Factors <br />Operator skill : <br />Material consistency : <br />Dozing method : <br />Visibility : <br />Job efficiency : <br />Spoil pile : <br />Push gradient : <br />Altitude : <br />Material weight : <br />Blade type : <br />Net correction : <br />Total job time : <br />Total job cost : $142 <br />Horsepower: 90 <br />Shift basis : 1 per day <br />Data source : (CRG) <br />Total fleet cost/hour : $80.62 <br />1.77 <br />LCY <br />Source <br />0.75 (avg.) <br />1.00 (Cat HB) <br />1.00 (gen.) <br />1.00 (avg.) <br />0.83 (lshift/day) <br />0.80 (fnd -rf) <br />1.00 (Cat HB) <br />0.96 (Cat HB) <br />0.79 (Cat HB) <br />1.00 (PAT) <br />0.38 <br />Adjusted unit production : 175.98 LCY /hr <br />Adjusted fleet production : 175.98 LCY /hr <br />Hours <br />
The URL can be used to link to this page
Your browser does not support the video tag.