Laserfiche WebLink
ii. Updates and future revisions to the EPP shall not include <br />reference to any MCP or SPCC that provides for the use of <br />Eagle Park Reservoir as a containment facility. <br />(d) To the extent the SPCC and MCP plans are required to be <br />incorporated in the EPP, the revised EPP will incorporate, by reference, an <br />updated SPCC Plan and MCP Plan that are compliant with State, Federal, <br />and local regulations and do not rely on Eagle Park Reservoir or Clinton <br />Reservoir for any level of containment. <br />DONE AND ORDERED this t day of A 5 2011. <br />Climax Molybdenum Company <br />Climax Mine, M -1977 -493 <br />Permit Amendment Application AM -06 <br />FOR THE COLORADO MINED LAND <br />RECLAMATION BOARD <br />L <br />NOTICE OF APPEAL RIGHTS <br />Elizabeth Paranhos, Chair <br />This order becomes effective and final upon mailing. Any party adversely affected <br />or aggrieved by agency action may commence an action for judicial review by filing <br />a notice of appeal with the district court within thirty (30) days after the effective <br />date of this order, pursuant to section 24 -4 -106, C.R.S. (2010). In the event that an <br />appeal is filed, designations of record made in accordance with section 24 -4- 106(6), <br />C.R.S. should be served on the Board at: 1313 Sherman Street, Room 215, Denver, <br />CO 80203, Attention: Sitira Pope. <br />6 <br />