Laserfiche WebLink
llaul 1■vu•. <br />Seg # <br />Haul Distance (Ft) <br />Grade <br />Roll. Res <br />Total Res <br />Velocity (fpm) <br />Travel Time <br />(CAT HB) <br />Job Efficiency: <br />( %) <br />( %) <br />( %) <br />(min) <br />1 <br />1500.00 <br />0.00 <br />5.00 <br />5.00 <br />1391 <br />1.17 <br />l'l.LUI 11 i.vu�ai. <br />Seg # <br />Haul Distance (Ft) <br />Grade <br />Roll. Res <br />Total Res <br />Velocity (fpm) <br />Travel Time <br />(CAT HB) <br />Job Efficiency: <br />( %) <br />( %) <br />( %) <br />(min) <br />1 <br />1500.00 <br />0.00 <br />5.00 <br />5.00 <br />2501 <br />0.87 <br />Scraper Worksheet Cont'd Task # 03A <br />Cycle Time: <br />Scraper Loading Time: <br />Maneuver and Spread Time: <br />Job Condition Correction: <br />• <br />Net Correction: <br />0.830 <br />NA <br />1.00 Minutes <br />0.70 Minutes <br />Travel Time: <br />Road Condition: Rutted dirt, little maintenance, no water, 2" tire penetration 5.0 <br />• <br />Haul Time: <br />1.17 <br />Site Altitude: 6350 feet <br />Return Time: <br />0.87 <br />minutes <br />minutes <br />Total Scraper team cycle time: 3.74 minutes <br />Adjusted for job conditions: 505.99 LCY /Hour <br />Selected Number of Scrapers: 2 Scraper(s) <br />Adjusted single scraper team (unit) hourly production: 1,011.98 LCY /Hour <br />Adjusted multiple scraper team (fleet) hourly production: 1,011.98 LCY /Hour <br />Unadjusted unit production/hour: 609.63 LCY /Hour <br />Optimal Number of Scrapers per push dozer: <br />JOB TIME AND COST <br />Fleet size: 1 Team(s) Total job time: 37.20 Hours <br />Unit cost: $0.499 /LCY Total job cost: $18,782.72 <br />Page 2 of 2 <br />CIRCES Cost Estimating Software <br />Scraper <br />Push Dozer <br />Source <br />Altitude Adj: <br />1.000 <br />NA <br />(CAT HB) <br />Job Efficiency: <br />0.830 <br />NA <br />(CAT HB) <br />Scraper Worksheet Cont'd Task # 03A <br />Cycle Time: <br />Scraper Loading Time: <br />Maneuver and Spread Time: <br />Job Condition Correction: <br />• <br />Net Correction: <br />0.830 <br />NA <br />1.00 Minutes <br />0.70 Minutes <br />Travel Time: <br />Road Condition: Rutted dirt, little maintenance, no water, 2" tire penetration 5.0 <br />• <br />Haul Time: <br />1.17 <br />Site Altitude: 6350 feet <br />Return Time: <br />0.87 <br />minutes <br />minutes <br />Total Scraper team cycle time: 3.74 minutes <br />Adjusted for job conditions: 505.99 LCY /Hour <br />Selected Number of Scrapers: 2 Scraper(s) <br />Adjusted single scraper team (unit) hourly production: 1,011.98 LCY /Hour <br />Adjusted multiple scraper team (fleet) hourly production: 1,011.98 LCY /Hour <br />Unadjusted unit production/hour: 609.63 LCY /Hour <br />Optimal Number of Scrapers per push dozer: <br />JOB TIME AND COST <br />Fleet size: 1 Team(s) Total job time: 37.20 Hours <br />Unit cost: $0.499 /LCY Total job cost: $18,782.72 <br />Page 2 of 2 <br />CIRCES Cost Estimating Software <br />