Laserfiche WebLink
COST SUMMARY WORK <br />Task description: Reclamation Cost Summary <br />Permit Action: June 9, 2011 <br />Inspection <br />Site: Blue Pit <br />PROJECT IDENTIFICATION <br />Task #: <br />Date: <br />User: <br />000 State: Colorado <br />6/20/2011 County: Garfield <br />DMC <br />Agency or organization name: DRMS <br />LIST (DIRECT COSTS) <br />INDIRECT COSTS <br />OVERHEAD AND PROFIT: <br />Liability insurance: <br />Performance bond: <br />Job superintendent: <br />Profit: <br />2.02 <br />1.05 <br />202.26 <br />10.00 <br />Total = <br />Total = <br />Total = <br />Total = <br />TOTAL 0 & P = <br />CONTRACT AMOUNT (direct + O & P) = <br />LEGAL - ENGINEERING - PROJECT MANAGEMENT: <br />Financial warranty processing (legal /related costs): 500.00 <br />Engineering work and/or contract/bid preparation: 0.00 <br />Reclamation management and /or administration: 5.00 <br />CONTINGENCY: 3.00 <br />Permit/Job #: M1981207 <br />Abbreviation: None <br />Filename: M207 -000 <br />Total = <br />Total = <br />$5,672.51 <br />$2,948.58 <br />$11,844.35 <br />$28,081.74 <br />$48,547.18 <br />$329,364.58 <br />500.00 <br />$0.00 <br />$16,468.23 <br />Total = $8,424.52 <br />TOTAL INDIRECT COST = $73,939.93 <br />TOTAL BOND AMOUNT (direct + indirect) = $354,757 <br />Task <br />Description <br />Form <br />Used <br />Fleet <br />Size <br />Task <br />Hours <br />Cost <br />0 1a <br />02a <br />02b <br />03a <br />04a <br />05a <br />06a <br />Demo on -site structures <br />DEMOLISH <br />1 <br />2 <br />2 <br />1 <br />2 <br />1 <br />1 <br />80.00 <br />$68,787.10 <br />$128,882.13 <br />$3,687.00 <br />$18,782.72 <br />$11,801.71 <br />$43,611.31 <br />$5,265.43 <br />324.53 <br />Highwall slope reduction <br />DOZER <br />8.63 <br />Rip pit floor and access roads <br />RIPPER <br />37.20 <br />Transport topsoil from stockpiles to dozers <br />SCRAPER1 <br />Distribute topsoil over disturbed area <br />DOZER <br />29.72 <br />Revegetate disturbed areas <br />REVEGE <br />40.00 <br />3.33 <br />Mobilize reclamation crew /equipment <br />MOBILIZE <br />SUBTOTALS: <br />523.41 <br />$280,817.40 <br />COST SUMMARY WORK <br />Task description: Reclamation Cost Summary <br />Permit Action: June 9, 2011 <br />Inspection <br />Site: Blue Pit <br />PROJECT IDENTIFICATION <br />Task #: <br />Date: <br />User: <br />000 State: Colorado <br />6/20/2011 County: Garfield <br />DMC <br />Agency or organization name: DRMS <br />LIST (DIRECT COSTS) <br />INDIRECT COSTS <br />OVERHEAD AND PROFIT: <br />Liability insurance: <br />Performance bond: <br />Job superintendent: <br />Profit: <br />2.02 <br />1.05 <br />202.26 <br />10.00 <br />Total = <br />Total = <br />Total = <br />Total = <br />TOTAL 0 & P = <br />CONTRACT AMOUNT (direct + O & P) = <br />LEGAL - ENGINEERING - PROJECT MANAGEMENT: <br />Financial warranty processing (legal /related costs): 500.00 <br />Engineering work and/or contract/bid preparation: 0.00 <br />Reclamation management and /or administration: 5.00 <br />CONTINGENCY: 3.00 <br />Permit/Job #: M1981207 <br />Abbreviation: None <br />Filename: M207 -000 <br />Total = <br />Total = <br />$5,672.51 <br />$2,948.58 <br />$11,844.35 <br />$28,081.74 <br />$48,547.18 <br />$329,364.58 <br />500.00 <br />$0.00 <br />$16,468.23 <br />Total = $8,424.52 <br />TOTAL INDIRECT COST = $73,939.93 <br />TOTAL BOND AMOUNT (direct + indirect) = $354,757 <br />