My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2011-06-22_INSPECTION - M1981302
DRMS
>
Day Forward
>
Inspection
>
Minerals
>
M1981302
>
2011-06-22_INSPECTION - M1981302
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
9/9/2022 2:53:34 PM
Creation date
6/23/2011 10:39:04 AM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
M1981302
IBM Index Class Name
INSPECTION
Doc Date
6/22/2011
Doc Name
Corrective Action Follow-Up
From
DRMS
To
Jeffrey Lipton- University of Colorado Boulder
Inspection Date
4/26/2011
Email Name
MAC
AJW
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
Page 1 of 1
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
DIVISION OF RECLAMATION, MINING AND SAFETY <br />Department of Natural Resources <br />1313 Sherman St., Room 215 <br />Denver, Colorado 80203 <br />Phone: (303) 866 -3567 <br />FAX: (303) 832 -8106 <br />June 22, 2011 <br />I Jeffery Lipton <br />/ I University of Colorado Boulder <br />Research Lab No. 2 <br />444 UCB <br />Boulder, CO 80309 <br />RE: Deepe Farm Pit; DRMS File No. M- 1981 -302; Corrective Action Follow -up <br />Dear Mr. Lipton, <br />The Division has received and reviewed your letter dated May 27, 2011 in regard to the above <br />referenced site. In the report of the inspection conducted onkpri126, 2011, the Division noted <br />that alterations had been made to the perimeter levee on the south and east sides of the site. The <br />alterations included raising the elevation of portions of the levee and adding larger riprap <br />material to the stream -side slope of the levee. <br />As you stated in your letter, Flatirons Company obtained approval of a Technical Revision prior <br />to doing major work on the levee. The Division defines a Technical Revision as a change in the <br />permit which does not have more than a minor effect upon the approved Reclamation Plan. A <br />Technical Revision must be submitted each time the Operator alters the Reclamation Plan. The <br />recent modifications to the levee were not covered under the previous Technical Revision. <br />Therefore, the Operator must submit a Technical Revision to account for the changes. Please <br />resubmit the levee construction plans and specifications in the form of a Technical Revision, <br />along with the required Technical Revision fee of $216.00. The Operator will be given until July <br />17, 2011 to submit the required materials. <br />If you have any questions, you may contact me at (303)866 -3567 x8116. <br />Sincerely, <br />f ivvu <br />/ Michael A. Cunni gham <br />Enviro mental Protection Specialist <br />CC: Waldron, DRMS <br />Office of <br />AA in■rl I and Porlarnatinn <br />STATE OF COLORADO <br />rIpnvpr • (:rand lunrtinn • I7nran¢n <br />COLORADO <br />D I V I S I O N O F <br />RECLAMATION <br />MINING <br />— &— <br />SAFETY <br />John W. Hickenlooper <br />Governor <br />Mike King <br />Executive Director <br />Loretta E. Pineda <br />Director <br />Office of <br />ArtivP and lnartivp Minas <br />
The URL can be used to link to this page
Your browser does not support the video tag.