My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2011-05-06_PERMIT FILE - C1981035A
DRMS
>
Day Forward
>
Permit File
>
Coal
>
C1981035
>
2011-05-06_PERMIT FILE - C1981035A
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
10/20/2016 9:54:41 AM
Creation date
6/23/2011 9:25:23 AM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
C1981035A
IBM Index Class Name
Permit File
Doc Date
5/6/2011
Section_Exhibit Name
KII Appendix 12 Reclamation Bond Estimate
Media Type
D
Archive
Yes
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
31
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
COST SUMMARY WORK <br />Task description: Re -seed water pipeline corridor (within 100' of CR 120) <br />Site: King Coal Mine Permit Action: TR -18 Permit/Job #: C1981035 <br />PROJECT IDENTIFICATION <br />Task #: 408 State: Colorado <br />Date: 4/19/2011 County: La Plata <br />User: TAK <br />Agency or organization name: DRMS <br />TASK LIST (DIRECT COSTS) <br />Abbreviation: None <br />Filename: C035 -408 <br />Task <br />Descri tion <br />Form <br />Used <br />Fleet <br />Size <br />Task <br />Hours <br />Cost <br />407 <br />Re -seed water pipeline within 100' of CR 120 <br />REVEGE <br />1 <br />0.20 <br />$60.17 <br />SUBTOTALS: <br />0.2 <br />$ $60.17 <br />INDIRECT COSTS <br />OVERHEAD AND PROFIT: <br />Liability insurance: <br />. 0.00 <br />Performance bond: <br />0.00 <br />Job superintendent: <br />0.10 <br />Profit: <br />10.00 <br />Total = <br />Total = <br />Total = <br />Total = <br />TOTAL O & P = <br />CONTRACT AMOUNT (direct + O & P) = <br />LEGAL - ENGINEERING - PROJECT MANAGEMENT: <br />$0.00 <br />$0.00 <br />$5.86 <br />$6.02 <br />$11.88 <br />$72.05 <br />Financial warranty processing (legal/related costs): <br />0.00 <br />Total = 0.00 <br />Engineering work and/or contractibid preparation: <br />0.00 <br />Total = $0.00 <br />Reclamation management and/or administration: <br />0.00 <br />$0.00 <br />CONTINGENCY: <br />0.00 <br />Total = $0.00 <br />TOTAL INDIRECT COST = $11.88 <br />TOTAL BOND AMOUNT (direct + indirect) = $72.05 <br />
The URL can be used to link to this page
Your browser does not support the video tag.