Laserfiche WebLink
Corey Heaps <br />CAM Colorado LLC <br />June 21, 2011 <br />Page 8 <br />the majority of the site. There will be two new ponds as shown on Map -16, and CAM <br />will not expose groundwater, nor will long term storage of stormwater runoff be of <br />concern as the pond will be dewatered as outlined in section 2.05.3(4). The ponds will be <br />dewatered once the water level is above the maximum sediment level, and /or 48 hours <br />after a precipitation event. The well permit applications have been submitted to the SEO. <br />Division Response: CAM's response was forwarded to the SEO for their review and we <br />are waiting to see if they have any farther comment. The Division believes that CAM's <br />response was appropriate and adequate. Please incorporate the SEO well permit <br />applications and the approved well permits when they are obtained into an <br />appropriate section of the PAP. <br />8. Water Rights locations are shown on Map 18. In accordance with Rule 2.04.7(1)(b) <br />please also provide well locations and reported yields from all wells within the proposed <br />permit and adjacent areas which are registered with the Office of the State Engineer. <br />This requirement was not addressed in the application. <br />CAM Response: Well locations were shown on Map -18, but for clarity, a different <br />symbol and color was given to wells within the permit and adjacent areas, please see <br />revised Map -18. Wells with a yield that are registered with the SEO are now shown on <br />pages 2.04 -23 to 2.04 -26. <br />Division Response: Response accepted. <br />9. For clarification of the well completion information provided, please revise the last <br />sentence of the 4 t1 ' paragraph on page 2.04 -14 as follows. "A typical completion diagram <br />along with a summary table of specific completion information for each monitoring well <br />is located in Volume I, Exhibit 3. The As -Built Drawings from 1981 when the wells <br />were drilled and completed are provided in Volume 1, Exhibit 14, Appendix A." <br />CAM Response: Please see revised pages 2.04 -14 to 2.04 -16. <br />Division Response: Response accepted. <br />10. Ground surface elevation information for the monitoring wells does not appear to be <br />consistent between the summary table information on the typical diagram in Exhibit 3 as <br />compared with the As -Built Drawings for the well completions provided in Exhibit 14. <br />Have the wells been re- surveyed by CAM? If so, were the ground surface and top of <br />casing elevations surveyed? Please expand the well completion summary table on the <br />typical diagram to include the following: ground surface elevation, top of casing or <br />measuring point elevation, and perforated interval depth. <br />CAM Response: CAM generated their topography, based on aerial photography from <br />May of 2010 and believes -it to be accurate. <br />