Laserfiche WebLink
Corey Heaps <br />CAM Colorado LLC <br />June 21, 2011 <br />Page 42 <br />Division Response: Response accepted. <br />Rule 2.05.4(2)(e) Revegetation Plan <br />67. Narrative regarding the schedule of revegetation indicates that the time frame for <br />revegetation could vary from as little as five years to more than 10 years. The intended <br />meaning of this statement is not clear. Please provide language to clarify that permanent <br />revegetation would be conducted during the 3` or 4 th year following permanent cessation <br />of operations, to be consistent with the reclamation schedule in 2.05.4(2)(a). <br />CAM Response: Please see revised page 2.05 -31 <br />Division Response: The text in section 2.05.4(2)(e)(i) states "The time frame for the <br />revegetation could vary from as little as five years to more than ten years. Permanent <br />revegetation would be conducted during the 3` and 4 th year following permanent cessation <br />of operations." It is unclear how the meaning of the first sentence relates to the second <br />sentence. Section 2.05.4(2)(e)(i) states that reclamation of the site will take four years. <br />Please clarify what the five to ten year time frame is, how it relates to the four year <br />reclamation plan and the definition/difference between revegetation and permanent <br />revegetation. <br />68. Please clarify that the seeding techniques for surface roughening described in Section <br />2.05.4(2)(e)(iii) apply to both interim and permanent seeding. <br />CAM Response: Please see revised page 2.05 -32 <br />Division Response: Response accepted. <br />69. Under the mulching techniques, please clarify the hydroseeding mulching techniques. <br />Address the type and rate of tackifier or other materials to be used for mulching when <br />hydroseeding sites. <br />CAM Response: Please see revised page 2.05 -32 <br />Division Response: Response accepted. <br />70. For the 22 -acre of barren/sterile disturbed soils, what type of amendment or alternative <br />surfacing is proposed? <br />CAM Response: Please see section 2.05.4(1) for discussion. <br />Division Response: Section 2.05.4(1) — The Division agrees with CAM to waive the <br />revegetation requirement in the industrial areas (shown on map 7) due the fact that the pre - <br />and post- mining land use is industrial and the pre - existing condition is void of vegetation, <br />