Laserfiche WebLink
Pond 016 Slide Remediation Plan <br />TR-73 Response to Adequacy Comments-2"d Round <br />Page 5 <br />discussed in Tab 13, Attachment 20-2, Permanent Structures Documentation, page 20-2.5, Stock <br />Ponds. SCC will provide as-built design information when the stock ponds are requested as <br />permanent. <br />26 Response previously accepted <br />27. Response previously accepted <br />28. Response previously accepted <br />29. Response previously accepted <br />30. Response previously accepted. <br />31. Response previously accepted <br />If there are further questions, please contact me. <br />Sincerely, <br />R6y A Karo <br />Reclamation Manager <br />Seneca Coal Company <br />enclosure(s) <br />cc: Foster Kirby (OSMRE) <br />Jennifer Maiolo (BLM) <br />Seneca Coal Company • P.O. Box 670 • Hayden, Colorado 81639 <br />Telephone (970) 276-5219 • FAX (970) 276-5222