My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
_INSPECTION - C1980005 (25)
DRMS
>
Day Forward
>
Inspection
>
Coal
>
C1980005
>
_INSPECTION - C1980005 (25)
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
11/5/2020 8:31:29 AM
Creation date
6/21/2011 7:42:59 AM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
C1980005
IBM Index Class Name
INSPECTION
Doc Name
Inspection Report
From
DRMS
To
Seneca Coal Company
Inspection Date
6/13/2011
Email Name
JDM
Media Type
D
Archive
No
Tags
DRMS Re-OCR
Description:
Signifies Re-OCR Process Performed
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
6
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
June 13,2011 C-1980-005/Seneca H Mine JDM <br /> Inspection Topic Summary <br /> NOTE: Y=Inspected N=Notlnspwted R-Comments Noted V=Violation Issued NA=Not Applicable <br /> 1Y -Air Resource Protection N -Roads <br /> N -Availability of Records R -Reclamation Success <br /> N -Backfill&Grading R -Revegetation <br /> NA - Excess Spoil and Dev. Waste NA - Subsidence <br /> NA -Explosives N -Slides and Other Damage <br /> N -Fish& Wildlife N -Support Facilities On-site <br /> R -Hydrologic Balance N -Signs and Markers <br /> Y -Gen. Compliance With Mine Plan NA -Support Facilities Not On-site <br /> R -Other NA -Special Categories Of Mining <br /> NA -Processing Waste R -Topsoil <br /> COMMENTS <br /> HYDROLOGIC BALANCE - Rule 4.05 <br /> Drainage Control 4,05.1,4.05.2,4.05.3; Siltation Structures 4.05.5, 4.05.6; Discharge Structures 4.05.7,4.05.10; <br /> Diversions 4.05.4; Effluent Limits 4.05.2; Ground Water Monitoring 4.05.13; Surface Water Monitoring 4.05.13: <br /> Drainage -Acid and Toxic Materials 4.05.8; Impoundments 4.05.6, 4.05.9; Stream Buffer Zones 4.05.18: <br /> The Seneca 11 Mine SL-5 bond release area consists of portions of Bond Release Blocks(BRB) 3,4,and 5. The <br /> BRBs contain 5 permanent contour ditches that flow into permanent established drainage SLIP-8. The BRBs also <br /> contain permanent drainage SIIPM-13 and SIIPM-13A. Pond 008 was approved as a permanent impoundment <br /> and is within the bond release area. Pond 008 was discharging at the time of the inspection with clear water. The <br /> water in the Pond was clear with no heavy sediment observed. The reclaimed drainages and ditches were <br /> inspected and found to be in good condition. The bond release area was stable with no major signs of instability, <br /> erosion,or movement, with the exception of the following repair and maintenance items: <br /> gully observed—300 It in length and—1 ft deep between V-Ditch#1 and V-Ditch#2 will require repair and <br /> maintenance <br /> Number of Partial Inspection this Fiscal Year: 9 <br /> Number of Complete Inspections this Fiscal Year: 4 <br /> Page 2 of 7 <br />
The URL can be used to link to this page
Your browser does not support the video tag.