Laserfiche WebLink
6 (FORM 2 - Public filing) <br />8. Describe the estimated topsoil depth and how topsoil will be salvaged, stockpiled and redistributed for the re-establishment of <br />vegetation. Specify approximate topsoil redistribution depth: <br />(NO ypnETATTnN 1)TSTuRRED) Work performed at the Historic Bear Hug Tunnel <br />sit. Onl past surface activities were removal of beetle-killed pine <br />trees (at the behest of the county). This left on open area which the a <br />inspector may have felt was a mining use, but was not(Query: is.re- <br />vegitating of this area which nature re-vegitating it. <br />9. Describe how drill holes will be plugged (refer to Rule 5.4 of the Rules for required abandonment procedures): <br />10. Describe how portals, adits, shafts, ponds, excavations, or other disturbances will be reclaimed (refer to Rule 3 a nd Rule 5 for <br />specific reclamation performance standards). You may wish to contact the Division for closure specifications. <br />Will k Ifith -I)RIIS en t ing a-gate en 4-1- 144 c+-ori rRear <br />g tunnel sit.- <br />11. Describe how roads will be reclaimed or returned to their pre-prospecting (or better) condition: <br />(NO NEW ROADS). The only road is spring Gulch road ( county <br />road maintained) and driveway into property. Also the Historic <br />wagon road (4WD), not county maintained which runs along the <br />westerly part of the property. No intent to upgrade roads. <br />.? f