RULE 2 PERMITS <br />about 6,200 feet in length and has a maximum sustained slope of 8.3 percent. The East Haul Road is <br />about 5,200 feet in length with a maximum slope of 5.8 percent. These roads are also specifically <br />designed to meet Rio Tinto internal road design guidelines while minimizing additional disturbed area <br />and preventing environmental damage. Other design requirements are presented in the Construction <br />Notes section of Map 25D and are summarized below. Cross fall slopes between centerline and road <br />shoulders shall be between 1 and 2 percent as directed by the field engineer. <br />Upon completion of these three roads, the entire running surface of the road shall be surfaced with <br />approximately 1.0 to 1.5 inches of rock or crushed gravel for traction. Additional crushed gravel surfacing <br />shall be reapplied as necessary throughout the life of the roadway. A 6 foot high berm shall be used at all <br />locations where the roadway is elevated. Cut slopes shall be 0.5H:1 V or less when completed in <br />competent rock. Elsewhere, cut slopes in unconsolidated materials shall be laid back at 1.5H:1V or less <br />as directed by the field engineer. Drainage from haul road shall be directed to the pit(s) wherever <br />possible. A ditch shall be installed at toe of all cut slopes. If needed, temporary erosion control measures <br />shall be implemented during construction to minimize sedimentation and eresicn until permanent control <br />measures can be established. The field engineer shall determine the need for control measures during <br />construction. Such temporary and permanent control measures would include silt fences, straw bales, <br />straw wattles, rock check dams, or other measures such as downstream sediment ponds. <br />Many truck routes within the Collom area will be constructed as in -pit truck routes, due to their location <br />within existing pit limits. Therefore, all truck routes constructed during the permit term within the <br />immediate mining area are exempt from any construction specifications, since roadways within the <br />immediate mining pit area are not included within the code of Colorado Regulations Definition of "road" <br />(Rule 1.04(111)). Out of pit haul roads such as those identified on Map 23B will be designed and <br />constructed in accordance with Rule 4.03. <br />In general, mining area truck routes are built with a crown, are ditched on either side for proper drainage, <br />have berms of at least axle height on outside (downslope) exposures, and only exceed grades of nine <br />percent for distances of less than 100 yards. Typical truck routes are from 80 feet to 120 feet wide, are <br />surfaced with sized crushed rock, and are maintained with motor graders. <br />In order to obtain access to the Little Collom Sediment Pond, an existing two track road will be upgraded <br />as shown on Volume 20, Exhibit 25, Item 1. This road, which is about 6,600 feet in length, has been <br />designed to meet the applicable portions of CDRMS Rule 4.03.2 for Access Roads. It is specifically <br />designed to meet the minimum design requirements while minimizing additional disturbed area and <br />preventing environmental damage. The road ties to existing county road 32. The completed road will <br />have a width of 12 feet. <br />Use of road is for routine environmental monitoring and occasional pond maintenance only. Typical road <br />use would consist of one trip per week by a light use vehicle using one way travel and low speed. <br />Horizontal alignment will exactly follow existing two track road alignment and is consistent with existing <br />natural topography. Overall grade of the road is approximately 6 %. The existing two -track road will be <br />hard bladed to remove all vegetation and rutting and to provide a level surface across roadway, with <br />maximum cut and fill depths of less than 2 feet. Following blading, a minimum 4 inch thickness of <br />clean, minus 2 inch gravel shall be placed and compacted across the entire width. A triangular V -ditch <br />approximately 18 inches in depth shall be cut on the uphill (Eastern) side of the completed roadway. <br />Routine road maintenance will consist of occasional blading and drainage control. Any outslopes created <br />from the construction of this access road will be seeded with the mix listed above post construction. <br />2.05.3 (4) Operation Plan — Ponds, Impoundments, and Diversions <br />Collom — Rule 2, Page 97 Revision Date: 5/20/11 <br />Revision No.: PR -03 <br />