My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2011-06-17_REVISION - C1981018
DRMS
>
Day Forward
>
Revision
>
Coal
>
C1981018
>
2011-06-17_REVISION - C1981018
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/24/2016 4:34:36 PM
Creation date
6/17/2011 2:50:05 PM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
C1981018
IBM Index Class Name
REVISION
Doc Date
6/17/2011
Doc Name
Proposed Decision Letter & Form
From
DRMS
To
Blue Mountain Energy, Inc
Type & Sequence
TR68
Email Name
JRS
SB1
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
4
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
COST SUMMARY WORK <br />Task description: Summary Sheet - B-Seam Dewatering System <br />Site: Deserado Mine Permit Action: Technical Revision 68 Permit/Job#: C1981018 <br />PROJECT IDENTIFICATION <br />Task #: 210 State: Colorado <br />Date: 16-Jun-11 County: Rio Blanco <br />User: JRS <br />Agency or organization name: DRMS <br />TASK LIST (DIRECT COSTS) <br />Task <br />Description Form <br />Used Fleet <br />Size Task <br />Hours <br />Cost <br />211 Remove Fence at B-Seam Dewatering System DEMOLISH 1 16.00 $3,505.92 <br />212 Regrade Four Dewatering Ponds DOZER 1 1.96 $388.55 <br />213 Regrade Last Chance Pond DOZER 1 0.40 $80.18 <br />214 Regrade Baffles in Artificial Wetlands DOZER 1 1.18 $256.94 <br />215 Replace Topsoil from Stockpile to Dewatering <br />Ponds DOZER 1 0.38 $82.67 <br />216 Replace Topsoil from Stockpile Last Chance Pond DOZER 1 0.15 $32.01 <br />217 Reseed B-Seam Dewatering System Area REVEGE 1 6.94 $1,937.46 <br />SUBTOTALS: 27.01 $ $6,283.73 <br />INDIRECT COSTS <br />OVERHEAD AND PROFIT: <br />Liability insurance: 2.02 <br />Performance bond: 1.05 <br />Job superintendent: 13.50 <br />Profit: 10.00 <br />Total = <br />Total = <br />Total = <br />Total = <br />TOTAL O & P = <br />CONTRACT AMOUNT (direct + O & P) = <br />LEGAL - ENGINEERING - PROJECT MANAGEMENT: <br />$126.93 <br />$65.98 <br />$790.56 <br />$628.37 <br />$1,611.84 <br />$7,895.57 <br />Financial warranty processing (legal/related costs): 0.00 Total = 0.00 <br />Engineering work and/or contract/bid preparation: 4.25 Total = $335.56 <br />Reclamation management and/or administration: 3.25 $256.61 <br /> <br />CONTINGENCY: 0.00 Total = $0.00 <br />TOTAL INDIRECT COST = $2,204.01 <br />TOTAL BOND AMOUNT (direct + indirect) = $8,487.74 <br />Abbreviation: None <br />Filename: C018-210
The URL can be used to link to this page
Your browser does not support the video tag.