Laserfiche WebLink
Mr. Michael Cunningham <br />Western Sugar Project <br />June 6, 2011 <br />Page 2 of 2 <br />wells. Varra will attempt to obtain access to monitor off-site wells in areas of concern. If a <br />complaint is received an assessment will be made as to the cause of the injury, if any. If any <br />adverse impacts are the result of mining operations, Varra will implement the most appropriate <br />remedy, which may include items a through d of this section. In all situations, the Division will be <br />contacted prior to implementing any corrective measures. <br />Item 5 - Varra Companies will continue to monitor water levels on a monthly basis and will <br />include these data in its annual report. <br />Item 6 - Varra will commit to installing two additional monitoring wells at the locations <br />presented on Figure 1. However, it should be noted that these wells will have little use other <br />than verifying model results once mining approaches the southern mine face as water levels will <br />be well below the Division's trigger point criteria. <br />If you have any questions regarding this letter, please contact me at 970-493-7780. <br />Sincerely, <br />CGRS, Inc. <br /> <br />Joby L. Adams, P.G. <br />Principal/Hydrogeologist