My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2011-03-29_HYDROLOGY - M1999069
DRMS
>
Day Forward
>
Hydrology
>
Minerals
>
M1999069
>
2011-03-29_HYDROLOGY - M1999069
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/24/2016 4:32:06 PM
Creation date
6/16/2011 10:31:54 AM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
M1999069
IBM Index Class Name
HYDROLOGY
Doc Date
3/29/2011
Doc Name
SWSP
From
Applegate Group, Inc.
To
DRMS
Permit Index Doc Type
Hydrology Report
Email Name
AJW
ECS
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
20
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
.....:,:::RLY PRODUCTI ::..:..:::::....... .:; ::.:::.:.: <br />HOU 9N sheet 2 of 2 <br />Haullna Capacity : <br />Basis : <br />Material weight : 2,100 pounds/LCY <br />Material description <br />Shale <br />Rated payload : 48,000 pounds <br />Payload capacity : 22.86 LCY <br />Bowl (volume) Basis : <br />Struck volume <br />Heaped volume : <br />Average volume : <br />Adjusted capacity : <br />14.00 LCY <br />20.00 LCY <br />17.00 LCY <br />17.00 LCY <br />hourly production reflects volume per scraper pair on push-pull models <br />Cycle Time : Job Condition Corrections : Site altitude ft): 5,000 <br /> Scraper Push dozer Source <br />Scraper loading time : 1.50 minutes Altitude adj, : 1.000 NA (Cat HB) <br />Maneuver and spread time : 0.60 minutes Job efficiency : 0.830 NA (Cat HB) <br />"load time per scraper pair on push-pull models Net correction : 0.830 NA <br />Travel time <br />Road condition description :Rutted dirt, little maintenance, no water, 2" fire penetration <br />Haul Routs : <br />Seg. # Haul distance (feet) Grade (%) Roll. res. (%) Total res. (%) Velocity (fpm) Travel time (mini <br />1 700 0.00 5.00 5.00 2218 0.46 <br />2 200 5.00 5.00 10.00 1068 -0.04 <br /> <br /> <br /> <br /> <br /> <br /> <br />Haul time : 0.42 minutes <br />Return route : <br />1 200 -5.00 5.00 0.00 2921 0.16 <br />2 700 0.00 5.00 5.00 2814 0.25 <br /> <br /> <br /> <br /> <br /> <br /> <br />travel time for each segment is adjusted for amelerstion/deeeleration. <br />table velocities are max. attainable per total resistance shown, not average <br />Total scraper team cycle time (load + haul + maneuver and spread + return) <br />Unadjusted unit production/hour : 347.90 LCY/hour "' Adjusted for job conditions <br />Optimal number of scrapers per push dozer : NA Selected number of scrapers : <br />Adjusted single scraper team (unit) hourly production : <br />Adjusted multiple scraper team (fleet) hourly production : <br />Return time : 0.41 minutes <br />2.93 minutes <br />288.76 LCY/hour <br />3 scraper(s) <br />866.28 LCY/hour <br />866.28 LCY/hour <br />JOB TIME AND COST <br />Fleet size : 1 Team(s) <br />Total job time : 242.42 Hours <br />Unit cost : $1.288 /LCY Total job cost : $270,427
The URL can be used to link to this page
Your browser does not support the video tag.