My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2011-03-29_HYDROLOGY - M1999069
DRMS
>
Day Forward
>
Hydrology
>
Minerals
>
M1999069
>
2011-03-29_HYDROLOGY - M1999069
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/24/2016 4:32:06 PM
Creation date
6/16/2011 10:31:54 AM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
M1999069
IBM Index Class Name
HYDROLOGY
Doc Date
3/29/2011
Doc Name
SWSP
From
Applegate Group, Inc.
To
DRMS
Permit Index Doc Type
Hydrology Report
Email Name
AJW
ECS
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
20
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
The Division has identified four approaches for operators: <br />1. File a financial warranty that will ensure backl'illing of the pit to cover the exposed ground water to a <br />depth of two feet above the static groundwater level or, <br />2. obtain a court approved augmentation plan priorto exposingground water or, <br />3. Pilo a financial warranty to cover the cost of installing a clay Ilner orsiurry wall that meatsthe <br />Division of WaterResources requirements for preventing groundwater exposure or, <br />4. Obtaln approval from the Division of Water Resources' that acknowledges compliance with the SM <br />requirements pursuant to 937-90-137111).' <br />The Division will work with operators on an Inalvldual basis as they move to Implement one of these plans. It <br />Is likely that options 1 and 3 will require the submittal of a technical revision or an amendment to the exlsting <br />permit depending on the nature of the current mining and reclamollon plan and the proposed changes, <br />increased financial warranties, as a result of these modifications, may be posted In a phased manner not to <br />exceed three years. Amendments or revisions currently under review will be required to be approved by <br />April 30, 2011 and may use the phased financial Warranty approach described above. New applications going <br />forward or presently under review by the Division will be required to meet the requirements of ono of the <br />optldns 1-4 at the time of application -approval. Failure of affected operators to initiate contact with the : _• <br />Dlvibion dnd ga7kompilance as described above could result in an enforcement action balm Issued by.tha, •r <br />Dlvislon. _ <br />If you have any questlgns, please contact Tony Waldfoa at 303.886-3567, extension 8150. , <br />cc] Permit Id Site Name
The URL can be used to link to this page
Your browser does not support the video tag.