Laserfiche WebLink
STATE OF COLORADO <br />DIVISION OF RECLAMATION, MINING AND SAFETY <br />Department of Natural Resources <br />1313 Sherman St., Room 215 <br />Denver, Colorado 80203 <br />Phone: (303) 866-3567 <br />FAX: (303) 832-8106 <br />COLORADO <br />DIVISION OF <br />RECLAMATION <br />MINING <br />SAFETY <br />John W. Hickenlooper <br />June 10, 2011 Governor <br />Mike King <br />Executive Director <br />Donald W. MacDonald <br />Loretta E. Pineda <br />Coors Energy Company Director <br />P.O. Box 467 <br />Golden, CO 80402 <br />Re: Keenesburg Strip Mine (Permit No. C-1981-028) <br />Proposed Decision - Technical Revision No. 42 (TR-42) <br />Modification of Permit Boundary <br />Dear Mr. MacDonald: <br />Enclosed you will find the Division of Reclamation, Mining and Safety's Proposed Decision for Technical <br />Revision No. 42 at the Keenesburg Strip Mine. Notice of the proposed decision will be published in the <br />Fort Lupton Press as soon as possible. The first publication will initiate the ten (10) day public comment <br />period for the Division's decision. <br />Please refer to the Performance Bond heading on the enclosed proposed decision form. If the amount of <br />Bond Held equals or exceeds the Revised Liability, you need not submit additional bond. However, if the <br />Revised Liability exceeds the Bond Held, please submit additional bond or rider to your existing bond <br />that equals or exceeds the Revised Liability. This Technical Revision must not be implemented until this <br />proposed decision becomes final and until any required increase in bond is submitted to and approved by <br />the Division. <br />If you have any questions, please contact me. <br />Sincerely, <br /> <br />Robert D. Zuber <br />Environmental Protection Specialist <br />Enclosure <br />C-TR-08 C1981028 RDZ 06102011031440.doc <br />Office of <br />Office of <br />Mined Land Reclamation Denver • Grand Junction • Durango Active and Inactive Mines