My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2011-06-09_PERMIT FILE - P2010026
DRMS
>
Day Forward
>
Permit File
>
Prospect
>
P2010026
>
2011-06-09_PERMIT FILE - P2010026
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/24/2016 4:34:21 PM
Creation date
6/16/2011 7:13:46 AM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
P2010026
IBM Index Class Name
PERMIT FILE
Doc Date
6/9/2011
Doc Name
Second notice of Deficiency
From
DRMS
To
Shell Exploration & Production Company
Email Name
THM
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
2
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
4. As discussed during the February 2, 2011 conference call between Harry Posey and <br />Division staff, the Division will require a pressure test after the production operation has <br />ceased for each well to assure that the integrity of the casing, cement and reservoir <br />contaimnent relative to the overlying L4 WBI are all still intact. <br />• Response Adequate <br />5. In Section 62.4 Subsurface Reclamation, it states "Afterwards and after the reservoir is <br />cooled to an average temperature below the boiling point of water at formation pressure <br />the voids generated by leaching, pyrolisis and production will be filled with water. " <br />Please describe the rational for filling the void created by the project with water. <br />• Response Adequate <br />6. In Section 3.1 it is stated "NOI and POD approvals are contingent on a shell and CSU <br />Agreement to terminate the RPP Lease ". Please provide a copy of a Shell and CSU final <br />agreement. <br />- The DRMS will not approve the NOI with a contingency but rather a commitment <br />from Shell stating, that the proposed NOI operation will not affect any of the area <br />leased to CSU for the Recreation and Public Purpose (RPP) lease until the CSU RPP <br />lease is released by the BLM and Shell's Sodium PRL is renewed by the BLM. <br />7. Please provide a copy of the site specific SPCC plan. <br />• Response Adequate <br />Please submit a response to the listed items as soon as possible. If your response to the <br />remaining adequacy issue is not received the request for the NOI may be denied. <br />If you need additional information, please contact me at the Division of Reclamation, Mining <br />and Safety, Grand Junction Field Office, 101 S. 3rd St., Suite 301, Grand Junction, Colorado <br />81501, telephone no. (970) 241-2042. <br />Sincerely, <br />Travis Marshall <br />Environmental Protection Specialist <br />cc: Paul Daggett <br />BLM-White River Field Office <br />220 East Market Street <br />Meeker, CO 81641 <br />ec: Steve Shuey, DRMS <br />Dave Bird, DRMS <br />
The URL can be used to link to this page
Your browser does not support the video tag.