Laserfiche WebLink
2011 Annual Report <br />Snyder Quarry <br />M-77-210 <br />Castle Concrete Company <br />Anniversary Date: May 27 <br />Overview of Permit Year: During the 2010-2011 operating year Snyder Quarry was very active as this quarry <br />has had to pick up business lost due to the Pikeview slide. Mining continued in Area AR A total of nearly <br />250000 tons of material has been moved into the northwest corner of Area WP to continue the backfilling of <br />the over-excavation. Area AP had additional roadways installed to access the lower portion of area AR <br />Annual Report Maps: The map provided in this annual report reflects the technical revision that was <br />approved in 2009 and includes the affected lands in Area AP. <br />Affected Lands: The amount of affected land increased to approximately 7.0 acres in the last year as Castle <br />moved into Area AP. Mining was completed in Area WP in 2010. As indicated by the map we are preparing to <br />move into the western portion of Area AP. Approximately 3.5 acres is expected to be affected. <br />Reclamation: The site is stable and is not subject to erosion. The storm water management systems were all <br />maintained including cleaning of all culverts. Noxious weeds were also sprayed and this will continue. The <br />lower portion of Area AP is almost accessible so that the detention basin can be blasted in this year. <br />Expected Activity (2011- 2012): The operation will continue with an anticipated increase in production and <br />sales from the previous year. <br />Bonding: This operation is covered under a financial warranty corporate surety arrangement provided by <br />Westchester Fire Insurance Company. <br />Castle Concrete 2009-2010 Annual Report <br />M-77-210 Snyder Quarry Page 1 of 1