Laserfiche WebLink
MCATEE CONSTRUCTION COMPANY <br />dba McAtee Paving Company • Sterling Redi Mix Company • Green Bros. Ready Mix <br />P.O. Box 1908 • Sterling, Colorado 80751 <br />Phone: 970-522-3647 9 Fax: 970-522-9725 <br />June 6, 2011 <br />Division of Minerals and Geology <br />Minerals Section <br />1313 Sherman Street Suite 215 <br />Denver, Colorado 80203-2273 <br />Re: Annual Report <br />MLR No. M-2007-013, Bollish Pit #2 <br />Anniversary Date: 6/13/10 <br />This pit HAS NOT been granted a Temporary Cessation, and it <br />HASoperated more than 180 days this year. The Financial Warranty <br />for this operation is $24,000.00, the permitted area in Logan <br />County, covers 40.23 ac. ± and the pit is not phased. As <br />required in Rule 1.6 the MINE PERMIT SIGN is at the entrance to the <br />pit and the boundary has been outlined with posts to delineate <br />the Permit Boundary. <br />The annual report requirements in the MLRB Rules and <br />Regulations, and the annual review letter are addressed in the <br />following report. Please refer to the 2010 ANNUAL REPORT MAP <br />submitted last year for areas discussed in this report. <br />(1) We continued to remove stockpiled material from the site <br />this year and no new area was disturbed this year. We have <br />8.72 acres ± disturbed at this time. <br />(2) The slope along the south line is graded and shaped but no <br />other reclamation was required. Mining will continue on the <br />'i working face when the stockpiles are depleted. <br />(3) The partially mined area covers 4.93± acres at this time <br />(brown) and stripped area covers 3.79± acres (yellow). We <br />expect to resume mining and processing this year if <br />stockpiles need replenishing, working east and north along <br />the mine face, in the direction shown on the map. <br />(4) Reclamation will begin again as the mine limits are reached. <br />Existing topsoil stockpiles along the sides and on the <br />bottom of the pit have overgrown with grasses and weeds so <br />we do not have an erosion problem at this time.