My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2011-06-09_INSPECTION - C1991078
DRMS
>
Day Forward
>
Inspection
>
Coal
>
C1991078
>
2011-06-09_INSPECTION - C1991078
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/24/2016 4:34:21 PM
Creation date
6/15/2011 7:55:59 AM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
C1991078
IBM Index Class Name
Inspection
Doc Date
6/9/2011
Doc Name
Inspection Report
From
DRMS
To
Honeywood Coal Company
Inspection Date
6/1/2011
Email Name
MLT
SB1
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
6
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
June 1, 2011 C- 1991- 078/Hainilton Mine MLT <br />Inspection Topic Summary <br />NOTE: Y= Inspected N =Not Inspected R= Comments Noted V= Violation Issued NA =Not Applicable <br />N -Air Resource Protection <br />N - Availability of Records <br />N - Backfill & Grading <br />N - Excess Spoil and Dev. Waste <br />NA - Explosives <br />N - Fish & Wildlife <br />R - Hydrologic Balance <br />N - Gen. Compliance With Mine Plan <br />R - Other <br />NA - Processing Waste <br />N -Roads <br />R - Reclamation Success <br />N - Revegetation <br />NA - Subsidence <br />N - Slides and Other Damage <br />NA - Support Facilities On -site <br />N -Signs and Markers <br />NA - Support Facilities Not On -site <br />NA - Special Categories Of Mining <br />N - Topsoil <br />COMMENTS <br />This was an aerial inspection of the Hamilton Mine conducted on Wednesday, June 1, 2011 at <br />approximately 12:30 p.m. Photos were taken by Division personnel, and reviewed by Marcia <br />Talvitie of the DRMS. Conditions appear to have been hazy or overcast at the time of the <br />inspection. <br />PERMITTING UPDATE: <br />The Division proposed its decision to approve SL2, Phase 11 Bond Release, on April 14, 2011. <br />Public Notice of the proposed decision appeared in the San Miguel Basin Forum on April 21 and <br />28. No requests for a hearing before the Mined Land Reclamation Board were received during <br />the comment period, which ended on May 23, 2011. Therefore, the Division's decision to <br />approve SL2 is considered to be final. <br />HYDROLOGIC BALANCE - Rule 4.05 <br />Drainage Control 4.05.1, 4.05.2, 4.05.3; Siltation Structures 4.05.5, 4.05.6; Discharge Structures <br />4.05.7, 4.05.10; Diversions 4.05.4; Effluent Limits 4.05.2; Ground Water Monitoring 4.05.13; <br />Surface Water Monitoring 4.05.13; Drainage — Acid and Toxic Materials 4.05.8; Impoundments <br />4.05.6, 4.05.9; Stream Buffer Zones 4.05.18: <br />• Pond B (Photo 1) has been approved for retention as a permanent feature. The pond was dry <br />at the time of the inspection. <br />RECLAMATION SUCCESS - Rule 4.15, Rule 3: <br />• Pond A and the associated diversion ditch located to the west were reclaimed in late 2010 <br />(Photo 2). There is no evidence of erosion of these areas having occurred. <br />• Based on the photos, it appears that there has been some reestablishment of vegetation this <br />season in the areas reclaimed in 2010. <br />• An overview of the western portion of the permit area, as viewed from the north, is provided <br />in Photo 3. <br />Number of Partial Inspection this Fiscal Year: 8 <br />Number of Complete Inspections this Fiscal Year: 3 Page 2 of 6 <br />
The URL can be used to link to this page
Your browser does not support the video tag.