My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2011-05-31_REVISION - C1982057
DRMS
>
Day Forward
>
Revision
>
Coal
>
C1982057
>
2011-05-31_REVISION - C1982057
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/24/2016 4:33:57 PM
Creation date
6/15/2011 7:51:19 AM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
C1982057
IBM Index Class Name
Revision
Doc Date
5/31/2011
Doc Name
2nd Adequacy Review (Memo)
From
Marcia Talvitie
To
Susan Burgmaier
Type & Sequence
TR73
Email Name
SLB
SB1
MLT
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
5
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
DIVISION OF RECLAMATION, MINING AND SAFETY <br />Department of Natural Resources <br />1313 Sherman St., Room 215 <br />COL OR A D O <br />d&:T <br />Denver, Colorado 80203 <br />DIVI SION OF <br />Phone: (303) 866-3567 <br />RECLAM_ATIN <br />FAX: (303) 832-8106 <br />INTEROFFICE MEMORANDUM <br />MINING <br />-&- <br />SAFETY <br />------------- <br />Date: 31 May 2011 <br />John W. Hickenlooper <br />Governor <br />To: Susan L. Burgmaier <br />Mike King <br />Executive Director <br />Loretta E. Piheda <br />From: Marcia L. Talvitie, P.E. Director <br />Subject: Seneca 11-W Mine (Permit No. C-1982-057) <br />TIC -73 — Pond 016 Area Slide Remediation Plan <br />2 °d Adequacy Review — Engineering / Geotechnical <br />Pursuant to your request, I have reviewed Seneca Coal Company's (SCC) May 3, 2011 response <br />to the Division's Preliminary Adequacy Review of TR-73. With respect to Engineering / <br />Geotechnical matters, the response includes a revised introductory narrative to Attachment 20-D, <br />and revised Exhibit 20-D.2, Sheets I and 2 of 2. <br />My comments of March 24, 2011 are repeated below, with the addition of identifying numbers <br />used in the PAR dated April 5, 2011. <br />Prior to backfilling Pond 016A, the pond must first be dewatered, and all saturated soils <br />must be removed (NWCC text says "stabilized", but no details are provided) from pond <br />bottom and in-slopes. <br />for the backfilling of Pond 01". This item has been satisfactorily addressed. <br />2. Standard Proctor curves must be developed for any materials used backfill Pond 016A. <br />The use of curves developed previously for other SCC projects is not acceptable. <br />Office of Office of <br />Mined Land Reclamation Denver ® Grand junction • Durango Active and Inactive Mines <br />
The URL can be used to link to this page
Your browser does not support the video tag.