Laserfiche WebLink
Table 1. Results of First Half, 2009, Groundwater Monitoring, GCC Rio Grande, Inc., Pueblo Cement Plant, Pueblo, Colorado. <br />Sampling conducted May 12, 2009. <br />A <br />na a Method Units MW-002 MW-003 MW-004 Du -01 <br />RADIOCHEMISTRY <br />Gro <br />Al <br />h <br />ss <br />p <br />a <br />Gro <br />B <br />t SM 7110B Ci/L 22+/-3 17+/-2 60+/-4 21 +/-3 <br />ss <br />e <br />a <br />Radi <br />226 SM_ 7110B <br />S Ci/L 14 +/-2 11+/-2 31 +/-3 18+/-2 <br />um <br />Radi <br />m 228 M 7500 Ra-B <br />A Ci/L 2.0+/-0.8 1.2 +/-0.7 3.8+/-1.2 1.9+/-0.8 <br />u <br />Total S <br />lid EP <br />Ra-05 Ci/L 0.9+/-0.7 0.8+/-0.7 5.9+/-1.0 1.5+/-0.7 <br />o <br />s EPA 160.3 m /L 2,130 1,910 3,980 2,120 <br />FIELD PARAMETERS <br />H <br /> Probe H 7.45 7.57 7 <br />14 <br />Cond <br />ti <br />e . <br />uc <br />v <br />Tem <br />er <br />t Probe us/Cm <br />° 1,640 1,414 2,770 <br />p <br />a <br />ure Probe C 10.8 10.9 12.7 <br />Notes - Analyses performed by Accutest Laboratory (Formerly Evergreen Analytical). Radiochemistry sub-contracted to Hazen <br />Research. NC = Not collected. <br />NA = Not Analyzed <br />Dup-O 1 = Blind duplicate of primary groundwater sample MW-002 <br />3 of 3